BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 21, 2023 at 8:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Ayer, Massachusetts. Completed plans call for site work for a water / sewer project.

As of September 21, 2023 project still not awarded. Consists of pipeline cleaning, pre- and post-rehabilitation closed circuit television (CCTV) inspection, sewer pipe rehabilitation by Ultraviolet (UV) cured-in-place pipe lining and associated work, sewer lateral rehabilitation by cured-in-place lateral lining and associated work, manhole rehabilitation, complete with all other appurtenances and related work required to complete the project. The Project, of which the Work under the Contract Documents is a part, is generally described as follows: [Brief description of Project] Providing all materials, equipment, labor, incidentals, and supervision for trenchlessrehabilitation of 15-inch, 21-inch, and 24-inch diameter sanitary sewer pipe including pipeline cleaning and preand post-rehabilitation closed-circuit television (CCTV) inspection, cured-in-place pipe lining (CIPPL) by Ultraviolet (UV) CIPPL, post rehabilitation reinstatement of service connections, curedin-place lateral connection lining (LCL), Additive Alternate bid item No. 1 - Manhole Rehabilitation; including manhole frame and cover replacement, cementitious lining, and epoxy lining and all appurtenances and related work to complete all bid items included in the contract Question Deadline Sep 06, 2023

Bid Results

Water / Sewer

$1,802,200.00

Public - City

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2023

October 13, 2023

Project location map

Multiple Locations, Ayer, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.