BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2024 at 7:00 PM

Updated June 15, 2024

Site work for a water / sewer project in Quintana, Texas. Completed plans call for site work for a water / sewer project.

Brazoria County intends to award a contract for the construction and repair of the Quintana Beach Public Fishing Pier in Quintana, Texas. The project consists of repairs to the existing pier structure, demolition of the existing Pier T-head, and construction of a pier extension and new T-head. The pier has been damaged by previous storms and requires repair in addition to the construction of a 180-foot extension and a 131-foot pier T-head. Deadline for Question Submitted for Clarifications November 28, 2023 @ 2:00 pm CST. Deadline for Responses to Clarifications posted electronically November 30, 2023 Any prospective respondent desiring any explanation or interpretation of the proposal must make a written request which must be received by the Purchasing Department on or before November 13, 2023 @ 2:00 pm CST. The request must be emailed to bidclarifications@brazoriacountytx.gov. Emails must include the project name and number in the subject field. Estimated Budget: $1,069,000.00 Estimated Completion Time: 150 days to 180 days

Post-Bid

Water / Sewer

$1,069,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
2
Bidding Soon
1,783
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

February 22, 2024

Project location map

898 2nd St, Quintana, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.