Site work and paving for a mixed-use development in Fort Dodge, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

The North 1st Street Reconstruction is located along the east side of the Des Moines River and begins at the south side of the N 1st Street bridge over Soldier Creek and ends at the intersection of S. 1st Street and 1st Avenue S. The project consists of clearing and grubbing, approximately 19,500 CY of class 10 earthwork of which consists of approximately 15,000 CY of imported fill, 5,750 SY of subgrade preparation and modified subbase, the removals of foundations, pavement, and utility structures and piping, the installation of approximately 780 LF of sanitary sewer, 1,360 LF of storm sewer, 2,600 LF of water main, 4,990 SY pavement, 2,370 SY of sidewalk, together with traffic control, pavement markings, seeding, erosion control, and related work. Milestone 1: The Contractor shall substantially complete the Division 3 Site work by the 1st day of July, 2022. This item shall include all work necessary to open the site area to allow the owner to begin construction on a building. Should the Contractor fail to complete the site work by the Milestone Date of the 1st day of July, 2022, liquidated damages of Five Hundred ($500.00) per calendar day will be assessed. Contractor shall fully complete the project by the 28th day of October, 2022. Should the contractor fail to fully complete the work in this timeframe, liquidated damages of One Thousand dollars ($1,000.00) per working day will be assessed for work not completed within the designated contract term. Site Directions: The N. 1ST STREET RECONSTRUCTION PROJECT is located along the east side of the Des Moines River and begins at the south side of the N 1st Street bridge over Soldier Creek and ends at the intersection of S. 1st Street and 1st Avenue S.

Bid Results

Roads / Highways

$2,349,925.00

Public - City

Paving, Site Work

76

5

2

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
37
Bidding Soon
471
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2022

March 24, 2022

img_map_placeholder

N 1st St, Fort Dodge, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.