BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Miamisburg, Ohio. Design plans call for site work for a road / highway; and for paving for a road / highway.

Plans call to complete the final segment of roadway improvements as part of the Austin Interchange Infrastructure Plan on the west side of Interstate 75. The final section, known as the Mound Connector Project, includes upgrading Miamisburg-Springboro Pike from Medlar Road to Benner Road and Benner Road from Miamisburg-Springboro Pike to Dayton-Cincinnati Pike. As of September 12, 2023, the project is in preliminary stage of design and in the process of obtaining funding. Further information regarding design completion and firm construction timeline has not been determined.

Design

Roads / Highways

$15,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
167
Bidding Soon
2,677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2025

Project location map

Multiple Locations, Miamisburg, OH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.