BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a municipal facility in Miamisburg, Ohio. Conceptual plans call for the renovation of a municipal facility.

RTA is seeking HVAC replacement at Lyons Rd South Hub. Currently all (3) indoor HVAC units have failed and need immediate replacement. Barge Design has developed a scope of work for the replacement of the existing units and the addition of an integrated controls system to tie back to GDRTA's campus wide HVAC controls program. Please see the related materials from Barge regarding the detailed scope of work and design intent. It is the policy of the Department of Transportation (DOT) that DBEs, as defined in 49 CFR Part 26, shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with federal funds under this Agreement. Although the DBE goal for this procurement is 0%, RTA welcomes DBE participation. Deadline for Questions 9/13/22 Responses to Questions, Clarifications, RFAE 9/14/22 Please contact Ruth Reed, Senior Purchasing Agent, at 937.425.8311 with any questions or inquiries concerning this RFQ. To ensure greater accuracy, please contact me via email rreed@greaterdaytonrta.org. A Bid Bond, Cashier's Check or Certified Check Must Accompany This Bid for Not Less Than 0 % of the Base Bid Price. In the Event Bid is Accepted, a Performance Bond in the Amount of 0 % & a Payment Bond in the Amount of 0% Will Be Required of the Contract Amount Within Ten (10) Calendar Days After Notification of Award. The RTA reserves the right, as the interest of the RTA requires, to postpone, accept or reject any and all quotes and to waive any informality in the quotes received. GENERAL Work is to be completed by a licensed contractor in the State of Ohio. Work shall be coordinated with GDRTA to allow for normal facility operation during construction. All required permits shall be included within each scope of work item listed below. Coordinate all work with other trades. Contractors shall visit the project site and become familiar with the existing site conditions prior to submitting their proposal. MECHANICAL Demolish (3) existing Carrier packaged units located in attic space including associated condensate drain piping, thermostats, and controls wiring. Demolish condenser-side ductwork back to exterior wall louver and blank-off louver weather-tight with insulation. Re-use supply and return duct to the fullest extent possible. Demolish existing electric duct heaters. Install (3) new 5-ton split system heat pumps (min. 13.0 SEER) with indoor AHUs. Install new 20kW electric duct heater with each air handler (3 total) to operate during winter heating mode. Comply with manufacturer's recommended clearances for indoor and outdoor units and to allow for maintenance and access. Install associated refrigerant lines through new exterior wall penetration. Seal annular space around wall penetration weather tight. Install condensate drain piping to floor drain near attic ladder. Re-connect to existing supply ductwork and install new duct and insulation as necessary. Install new BACnet MTSP thermostats for heat pump and electric duct heater controls. Integrate controls to Tridium Web Supervisor through new Tridium Jace 8000 controller (or equal) and install new CAT6 cable to RTA-provided IT switch and connect to RTA provided IP address. Run system start-up and verification. Demonstrate operation of equipment to RTA personnel before project close-out. Install (3) outdoor HVAC units on exterior CMU wall on north side of the building. Install units as high as possible on CMU wall while maintaining outdoor HVAC unit manufacturer's required clearances. Utilize galvanized steel mounting brackets (minimum (2) per outdoor HVAC unit) with minimum (2) anchor points in exterior CMU wall per bracket. Fasten brackets to CMU using a minimum of (2) 1/4 " diameter Tapcon screws with 1" minimum embedment per anchor point or (8) total per unit. Anchors shall be spaced a minimum of 3" apart and 2" from the edge of the concrete block it is secured to. Seal all penetrations of building envelope for mechanical scope of work weather tight. ELECTRICAL Remove electrical connections to (3) existing heat pumps and (3) electric heaters. Circuits and disconnect switches to be re-used to the fullest extent possible. Reconnect electrical connections to (3) air handlers and (3) electric heaters. Install (3) new disconnect switches for outdoor heat pumps. Install new panelboard for outdoor heat pumps. Seal all penetrations of building envelope for electrical scope of work weather tight.

Project Abandoned

Municipal

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
86
Bidding Soon
1,239
All Active Projects
535
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2022

October 17, 2022

img_map_placeholder

2730 Lyons Rd, Miamisburg, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.