BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a swimming pool in Minot, North Dakota. Completed plans call for site work for a swimming pool.

*As of March 2 2022, the project was awarded to RenoSys Corporation for $140,580. The start date is 9/6/2022 completion date is approx. 11/1/2022. Roosevelt Pool Liner Then presented to the Board of Park Commissioners on February 15th at 6:30pm The Board of Park Commissioners reserves the right to reject any and all Bids, waive any irregularities therein, and to award the contract as they deem to be the best interest of the Minot Park District. Bidders are invited to be present at the above -mentioned time and place for the opening of the bids. Proposals will be presented to the Minot Park Board on February 15th at 6:30pm. Bid Questions: Jarrod A. Olson Director of Operations Minot Park District jarrod@minotparks.com (701) 857-4136 Office (701) 833-7021 Cell o Project time frame - Begin September 6th, 2022, and completed by October31st, 2022 o ND Contractor's License and Proof of insurance o Any change orders need to be approved by Park District prior to starting work o Include pricing for preparation, removal, Installation, and cleanup work o List company repair rates outside of warranties if applicable o List all warranties for materials and work o Broom clean pool surface and void it off all loose debris o Coat interior of the pool with sanitizing agent. Apply required adhesive o Apply (150 mil minimum) membrane from the pool o Install the 60 mil PVC membrane through hot air welding throughout o Termination to be at top of pool wall (below gutter) o Install Stainless Steel Skirt for liner termination and Pressure test o Terminate all penetrations with compression flanges o Complete all caulking, detail work, finish work to make a complete watertight installation o Install all applicable lane marking's o Clean site suitable for pool filling and perform final inspection

Award

Swimming Pools

$140,580.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
2
Bidding Soon
41
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

September 6, 2022

img_map_placeholder

1219 E Burdick Expy, Minot, ND

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.