BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Farmington, New York. Completed plans call for site work for a water / sewer project.

The project involves replacement of the existing 8" cast iron watermain beneath the intersection of NYS Routes 332 & 96 with approximately 600 LF of 14" HDPE and approximately 250 LF of 12" PVC watermain, valves, and hydrants. The 14" HDPE watermain and HDPE casing is designed to be directionally drilled through the bedrock at each NYSDOT road crossing. The Town of Farmington does not discriminate on the basis of handicapped status in admission or access to, or treatment or employment in, its programs and activities. For a non-refundable fee of Ten Dollars ($10), interested firms may request and receive an Electric Download of the Bidding Documents. Bid security shall be furnished in accordance with the Instructions to Bidders. For a non-refundable fee, printed copies of the Bidding Documents may be obtained electronically, If the documents are to be shipped, the Bidder must furnish Avalon with the Bidder's active UPS or Federal Express account number or pay Avalon for all shipping and handling costs. The Bidding Documents must be obtained through the Avalon Planroom in order to be considered a Plan Holder of record. Bidding Documents obtained from any other source are for examination only, are not considered complete and are not valid for bidding purposes. Attention of the bidders is particularly directed to the requirements of the conditions of employment to be observed and minimum Wage Rates to be paid under the Contract. The Town of Farmington does not discriminate on the basis of handicapped status in admission or access to, or treatment or employment in, its programs and activities. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Town of Farmington, nor Engineer, nor Avalon will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. The Town of Farmington, Ontario County, New York, reserves the right to reject any or all bids, or to waive any informalities, or to make an award to other than the low bidder. It further reserves the right to limit the amount of the award. Attention of the bidders is particularly directed to the requirements of the conditions of employment to be observed and minimum Wage Rates to be paid under the Contract.

Bid Results

Water / Sewer

$653,585.00

Public - City

Site Work

11

20

4

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
57
Bidding Soon
1,109
All Active Projects
593
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

April 18, 2022

img_map_placeholder

NY-96 & NY-332, Farmington, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.