Site work and paving for a mixed-use development in Bowling Green, Kentucky. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.

This project will continue the multi-phase road improvements along Smallhouse Road. Phases I and II focused on the area from Campbell Lane though the intersection with Ridgecrest Way. These improvements included roadway widening, the addition of curb, gutter and sidewalk, stormwater and utility upgrades, and the addition of a multi-use path. Phase Ill is underway and includes construction to extend the multi-use path from Ridgcrest Way to Scottsville Road as well as minor intersection improvements at Scottsville Road. Phase IV would continue to address traffic concerns on Smallhouse Road but would focus on the segment south of Campbell Lane to Robertson Way (approximately 0.70 miles). Key improvements would include widening and the addition of pedestrian facilities to connect to the existing multi-use path along Smallhouse Road in order to provide access to adjacent neighborhoods. FY2024 - Funds would be allocated for the professional services and property acquistion - anticipated cost is $600,000. FY2025 & FY2026 - Funds would be allocated for a portion of the construction - anticipated construction cost is $4,400,000, which would be provided over a two year period This project is in included in the City of Bowling Green FY 2022-2026 Capital Improvement Plan (CIP). As of Februry 01, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$2,800,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
15
Bidding Soon
704
All Active Projects
271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

img_map_placeholder

Multiple Locations, Bowling Green, KY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.