Published December 15, 2022 at 7:00 PM

Updated August 27, 2025

Site work for a water / sewer project in Long Beach, California. Completed plans call for site work for a water / sewer project.

As of December 15, 2022, construction is underway as of August, 2022, and expected to be completed in June, 2023. The Work shall include but not limited to all labor, equipment and materials necessary to complete the following work: This work shall include but not limited to furnishing all labor, equipment and materials necessary for installation of new 6-inch/8-inch/12-inch polyvinyl chloride pipe, wax tape of ductile iron flanges, tape wrap and polyethylene wrapped ductile iron fittings, couplings, thrust blocks, valve anchors; installation of 6-inch/8-inch/12-inch gate valves; installation of 12-inch insertion valves; installation of 1-inch/2-inch water services, fire services and air relief valve assemblies; installation of fire hydrant assemblies; installation of 2-inch blow-off assemblies; connections to existing water mains; installation of PVC casing; relocation of existing sewer laterals; abandonment of existing water main, services, valves and fire hydrant laterals; removal and disposal of existing fire hydrant head and bury; appurtenant items such as traffic control, pavement removal and replacement, excavation, backfill and compaction, pressure testing and disinfection, and all other work necessary to complete this project complete in place. The Work must be completed within three hundred and fifteen (315) calendar days after the commencement date stated in the Notice to Proceed The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make award to the lowest responsible bidder as it may best serve the interest of the Owner. Questions must be received by 4:30 PM on February 23, 2022 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Under Construction

Water / Sewer

$3,860,322.00

Public - City

Site Work

14

19

13

7

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
660
Active Projects
312
Bidding Soon
3,631
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2022

August 1, 2022

Project location map

Spinnaker Bay Dr, Long Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.