Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in El Paso, Texas. Completed plans call for the renovation of a 53,560-square-foot transportation facility.
NASA T-38 Hangar Hangar One and GSE Workshop Roof Replacement WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists, but is not limited to the following: 1. This hangar will be referred to as T-38 Hangar. 2. The Roof replacement single-story Metal Hangar Building and two-story office suite, 26,730 square feet in size. 3. Roof Section A - The work includes existing metal roof panels on the single-story Hangar section to remain, removal will consist of eave trim, gutters, downspouts, etc. Minimal mechanical and electrical systems will be removed and reinstalled. 4. Roof Section A2 & A3 - The work includes complete built-up roof system removal on the two-story office suite and complete removal and reinstallation of mechanical and electrical systems currently found on the roof. 5. Roof Section A - Improvement work includes re-cover over existing metal roof panel system. The re-cover will be with 238T panels on metal clips with rigid insulation sandwiched between existing panel and new panel. Minimal interior work will be limited to portions of the interior removed due to demolition operations. 6. Roof Section A2 & A3 - The work includes completely new PVC roof system and reinstallation of mechanical and electrical systems removed during demolition operations. One HVAC unit will be replacement along with associated electrical work. 7. Exterior sitework; Minimal grading & drainage as noted on plans. 8. The Hangar will remain occupied and operational during construction. B. The Work of Project is defined by the Contract Documents and consists, but is not limited to the following: 1. These Hangars will be referred to as Hangar One and GSE Workshop. 2. The roof replacement of a single-story metal building known as Hangar One. The higher section of the building houses the Hangar (20,063 SF), and the lower section houses the office suite (6,766 SF), the total square footage is 26,830. 3. Roof Section B- the replacement includes complete roof re-cover system over existing metal roof panels on the higher section of the Hangar with minimal mechanical and electrical system removal and reinstallation. 4. Roof Section B2 - The replacement includes complete roof removal of metal roof panels on the lower section of the Hangar with substantial mechanical and electrical system removal and reinstallation. Owner reserves the right to reject Contractors measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor Manufacturers authorized Installer who is approved or licensed for installation of elastomeric sealants required for this Project It is the intent of these specifications and drawings to furnish a plumbing system, inside and outside of the building, complete, fully adjusted and ready to use. All work and material must conform to all State and Local Plumbing Codes in every respect. Furnish, deliver and install all finish hardware required for adequately and satisfactorily equipping all doors and other movable parts throughout the building whether specifically mentioned herein or not, unless specifically excluded herein below. Any hardware required to complete the work, but not specifically mentioned herein, shall be provided of the same quality and type as specified for similar parts adjacent thereto Question Deadline 9/27/2023 at 5:00 PM MT Questions have asked to Harold D. Russell Answers Provided 10/4/2023 Evaluation Sept - October 2023 Contract Award Date (approx.) November 2023
Post-Bid
Transportation Terminals
$562,975.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 11, 2023
December 7, 2023
8101 Boeing Dr, El Paso, TX
Related To This Project
El Paso, TX
--
El Paso, TX
Bid Date: Sep 12 2023
El Paso, TX
Bid Date: Sep 13 2023
El Paso, TX
--
El Paso, TX
Bid Date: Sep 07 2023
El Paso, TX
Bid Date: Sep 21 2023
El Paso, TX
--
El Paso, TX
Bid Date: Sep 13 2023
El Paso, TX
--
El Paso, TX
Bid Date: Aug 30 2023
El Paso, TX
--
El Paso, TX
Bid Date: Sep 05 2023
El Paso, TX
--
El Paso, TX
Bid Date: Aug 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.