BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 22, 2022 at 7:00 PM

Updated November 14, 2023

Site work, paving and new construction of a mixed-use development in Stockton, California. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; transportation facility; and for paving for a transportation facility.

The Port of Stockton is seeking submittal of SOW and CP for professional engineering services for the completion of final design for construction of the Port of Stockton Rail Bridge and Rail Improvements project. Requested services include the following: Design level surveys and right-of-way verification, geotechnical studies, hydraulics and hydrology studies, acquisition of required permits, coordination with external agencies, coordination of utilities; project schedule; final design including construction drawings, special provisions and cost estimates; other services necessary to advance the project to the bid stage including all permits; other services deemed necessary to complete this project including services during construction. Portions of this project are being funded with the State of California SB1 Trade Corridor Enhancement Program (TCEP) Funds and must follow guidance from the California Transportation Commission, and other agency requirements, as applicable. The required engineering services shall be performed in general accordance with UP/BNSF Grade Separation Guidelines, AREMA, Caltrans, Federal Highway Administration (FHWA), and American Association of State Highway and Transportation Officials (AASHTO) Standards as interpreted by the Port of Stockton. In accordance with the Port of Stockton procurement procedures, disadvantaged business enterprise (DBE/UDBE) including qualified small minority and woman-owned firms are encouraged to participate in the completion of the work covered by this request. CONTRACT TIME. Work shall be finally completed by June, 2027, to coincide with construction completion. Port will not conduct a Mandatory Pre-Proposal Conference and Site Visit Service Providers are solely responsible for the cost of preparing their Proposals Port specifically reserves the right, in its sole discretion, to reject any or all Proposals, or re- release the Request for Proposal, or to waive inconsequential deviations from Proposal requirements not involving time, price, or quality of the Work. The method of contractor selection has not been determined at this time.

Conceptual

Bridges / Tunnels

$3,000,000.00

Public - City

New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
529
Active Projects
207
Bidding Soon
3,241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

Project location map

To Be Determined, Stockton, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.