BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 6, 2022 at 8:00 PM

Updated November 15, 2023

Renovation of a water / sewer project in Appleton, Wisconsin. Completed plans call for the renovation of a water / sewer project.

Pre-Qualification: Yes Work consists of Procurement, Unload, Handle, Install, Connect, Test, Commission, and Energization of new and existing power cables and conduits from new unit substation #1 (SS1) and unit substation #2 (SS2) to existing Motor Control Center (MCC). Unit Substation #1 will feed CCS 3, CCS 2A, MCC 10, MCC 15 AND CCS 2B and Unit Substation #2 will feed Building E new PDP, MCC 7AA, MCC 7B, MCC 16, MCC 18, MCC 20, MCC 6, MCC 8, MCC 9, MCC 12, MCC 14, MCC 17 AND MCC 19.

Award

Water / Sewer

$1,595,000.00

Public - City

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
62
Bidding Soon
568
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

March 23, 2022

Project location map

2006 E Newberry St, Appleton, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.