Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Monee, Illinois. Contact the soliciting agency for additional information.
Job No. C-91-370-20, IL-57 from Kankakee County Line to Steger Rd (Rest Area & Weigh Station), Phase III Project, Will County, Region One/District One. This project may contain Federal Funds. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 5, 2022 at 10:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering is required to provide construction inspection services for the above subject improvement. Work includes, but is not limited to, Standard Overlay, Resurfacing (Int 3rd), Rest Area Improvements, Weigh Station Repairs, and Bridge Deck Sealing. The work at the Prairie View Rest Areas includes resurfacing of the parking lots, upgrading the ADA Ramps and other miscellaneous repairs. The repairs to the Peotone Weigh Stations include Class A and Class B patching of the bare concrete pavement ramps. The work at the structures carrying I-57 over abandoned Railroad, S.N.' S 099-0038 & 0039 (12.8 miles South of US 30) includes sealing the bridge decks. The ITS scope includes upgrades to the I-57 mainline Weigh-In-Motion Sensors in a 300 ft Class A Patch and installation of Bluetooth Detectors. Also included is pavement patching, temporary pavement, pavement marking and all incidental and collateral work necessary to complete the project as shown in the plans and as described herein. Traffic will be maintained on I-57 using staging. The following structures may be in this project: o S.N. 099-0038: IL-57 over abandoned Railroad o S.N. 099-0039: IL-57 over abandoned Railroad Quality Assurance (QA) oversight and Contractor's Quality Control (QC) by the same Consultant or one of their Subconsultants on the same project or on material coming in from the same plant is prohibited. At the negotiations meeting, the Prime Consultant, and subconsultant(s) will disclose all current relationships with contractors. The anticipated construction completion date is July 1, 2023. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 4- RFQ - CEI IL-57 from Kankakee County Line to Steger Rd (Rest Area & Weigh Station), Phase III Project
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 24, 2022
I-57, Monee, IL
Related To This Project
Monee, IL
Bid Date: Jan 30 2024
Monee, IL
Bid Date: Feb 06 2024
Monee, IL
Bid Date: Jan 18 2024
Monee, IL
Bid Date: Mar 08 2024
Monee, IL
Bid Date: Mar 08 2024
Monee, IL
Bid Date: Mar 06 2024
Monee, IL
Bid Date: Dec 15 2021
Monee, IL
Bid Date: Dec 17 2021
Monee, IL
Bid Date: Sep 07 2023
Monee, IL
Bid Date: Jul 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.