BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Saint Louis, Missouri. Completed plans call for the renovation of a educational facility.

The installation of the walk-in cooler with common wall to include: receiving the box and all associated materials at the job site and assuming all damages, set up of the unit in place, mounting of condensers on exterior, running all new refrigeration lines, drain lines, piping, wiring, hooking up electrical connections, and installing air curtain. It also including trim of interior and exterior walls. The vendor is responsible for starting the unit and making all necessary adjustments. The refrigeration contractor will provide one return trip to the job site ten (10) days after startup to check refrigerant and oil levels and adjustment temperature defrost times. RGSD reserves the exclusive right to reject the bid of any Vendor in part or total for reasons deemed appropriate, such as a documented past experience(s) in which the Vendor failed to perform according to stated specifications once awarded the bid, suspicious financial responsibility of the Vendor, instances in which Vendor offered references were checked with resulting negative connotations, etc. RGSD reserves the right to accept the "lowest and best" bid, which in their judgment, assures RGSD the product(s) or service(s) having the best performance and the highest level of function, quality and value. Any Vendor which does not indicate on the "Quoting On" line for each item on which a quotation is submitted, exactly what is being offered, may expect that item to be rejected, due to the fact that what is being offered cannot be clearly identified and compared to what is specified. The vendor is responsible for the removal and disposal of the old walk-in cooler and freezer including, but not limited to the walk-in boxes, floors, ceilings, lighting fixtures, walls and refrigeration systems, piping and associated wiring and any materials needed to gain access to and install new equipment. 3. All trash and scrap are to be removed from the site or put in dumpsters designated by school maintenance personnel or the food service director. Materials must be removed in a proper and legal manner. 4. The installation of the walk-in cooler with common wall to include: receiving the box and all associated materials at the job site and assuming all damages, set up of the unit in place, mounting of condensers on exterior, running all new refrigeration lines, drain lines, piping, wiring, hooking up electrical connections, and installing air curtain. It also including trim of interior and exterior walls. The vendor is responsible for starting the unit and making all necessary adjustments. The refrigeration contractor will provide one return trip to the job site ten (10) days after startup to check refrigerant and oil levels and adjustment temperature defrost times. 5. Unit to be fully-functioning. 6. The existing electrical services shall be reused for the replacement project. If existing electrical service is insufficient it is the bidder's responsibility to communicate this prior to ordering the units *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$38,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
38
Bidding Soon
847
All Active Projects
334
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2022

April 1, 2022

img_map_placeholder

9926 Fonda Dr, Saint Louis, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.