Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Saint Louis, Missouri. Completed plans call for the renovation of a educational facility.
The installation of the walk-in cooler with common wall to include: receiving the box and all associated materials at the job site and assuming all damages, set up of the unit in place, mounting of condensers on exterior, running all new refrigeration lines, drain lines, piping, wiring, hooking up electrical connections, and installing air curtain. It also including trim of interior and exterior walls. The vendor is responsible for starting the unit and making all necessary adjustments. The refrigeration contractor will provide one return trip to the job site ten (10) days after startup to check refrigerant and oil levels and adjustment temperature defrost times. RGSD reserves the exclusive right to reject the bid of any Vendor in part or total for reasons deemed appropriate, such as a documented past experience(s) in which the Vendor failed to perform according to stated specifications once awarded the bid, suspicious financial responsibility of the Vendor, instances in which Vendor offered references were checked with resulting negative connotations, etc. RGSD reserves the right to accept the "lowest and best" bid, which in their judgment, assures RGSD the product(s) or service(s) having the best performance and the highest level of function, quality and value. Any Vendor which does not indicate on the "Quoting On" line for each item on which a quotation is submitted, exactly what is being offered, may expect that item to be rejected, due to the fact that what is being offered cannot be clearly identified and compared to what is specified. The vendor is responsible for the removal and disposal of the old walk-in cooler and freezer including, but not limited to the walk-in boxes, floors, ceilings, lighting fixtures, walls and refrigeration systems, piping and associated wiring and any materials needed to gain access to and install new equipment. 3. All trash and scrap are to be removed from the site or put in dumpsters designated by school maintenance personnel or the food service director. Materials must be removed in a proper and legal manner. 4. The installation of the walk-in cooler with common wall to include: receiving the box and all associated materials at the job site and assuming all damages, set up of the unit in place, mounting of condensers on exterior, running all new refrigeration lines, drain lines, piping, wiring, hooking up electrical connections, and installing air curtain. It also including trim of interior and exterior walls. The vendor is responsible for starting the unit and making all necessary adjustments. The refrigeration contractor will provide one return trip to the job site ten (10) days after startup to check refrigerant and oil levels and adjustment temperature defrost times. 5. Unit to be fully-functioning. 6. The existing electrical services shall be reused for the replacement project. If existing electrical service is insufficient it is the bidder's responsibility to communicate this prior to ordering the units *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Educational
$38,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2022
April 1, 2022
9926 Fonda Dr, Saint Louis, MO
Related To This Project
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Feb 26 2022
Saint Louis, MO
Bid Date: Feb 25 2022
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Mar 02 2022
Saint Louis, MO
Bid Date: Feb 07 2022
Saint Louis, MO
Bid Date: Feb 07 2022
Saint Louis, MO
Bid Date: Jan 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.