Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Yorkville, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Job No. C-93-019-14, IL 71 from IL 126 to Orchard Rd, Phase III Project, Kendall County, Region Two/District Three. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 27, 2022 at 1:00 PM at the Region Two/District Three Office in Ottawa. Phase III engineering services are required for the reconstruction of IL 71 from IL 126 to Orchard Road in Kendall County. Work involved includes construction of two lanes of PCC pavement in each direction separated by a raised concrete median. Other work items involved include curb and gutter, storm sewer, shared use path, replacement of all drainage structures, lighting, and more. Utility relocation are expected to delay primary construction activities until mid-summer 2023. Anticipated completion of the project is summer of 2026. The anticipated construction completion date is August 1, 2026. The Consultant must complete and submit final measurements, calculations, and final contract record documents to the department no later than six (6) weeks after completion of this project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Prequalified firms may indicate their desire to be considered for selection on any of the projects listed herein by submitting a separate Statement of Interest (SOI) for each project. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 29 - RFQ - IL 71 from IL 126 to Orchard Rd, Phase III Project
Conceptual
Roads / Highways
$3,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2023
IL-71, Yorkville, IL
Related To This Project
Yorkville, IL
Bid Date: Feb 17 2022
Yorkville, IL
Bid Date: Feb 15 2022
Yorkville, IL
Bid Date: Feb 04 2022
Yorkville, IL
Bid Date: Mar 04 2022
Yorkville, IL
Bid Date: Mar 08 2022
Yorkville, IL
Bid Date: Mar 04 2022
Yorkville, IL
Bid Date: Jun 21 2019
Yorkville, IL
Bid Date: Feb 17 2022
Yorkville, IL
Bid Date: Aug 31 2023
Yorkville, IL
Bid Date: Aug 30 2023
Yorkville, IL
Bid Date: Mar 11 2022
Yorkville, IL
Bid Date: Dec 07 2021
Yorkville, IL
Bid Date: Mar 06 2020
Yorkville, IL
Bid Date: Jul 14 2023
Yorkville, IL
Bid Date: Jun 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.