Site work for a water / sewer project in Delta, British Columbia. Completed plans call for site work for a water / sewer project.

The City of Delta is seeking to construct two sanitary sewer projects: Project 1: A new sanitary sewer forcemain in Tilbury, from Highway 17 at 7480 Wilson Avenue to the intersection of Progress Way at 76 Street. Project 2: A new gravity sanitary trunk sewer along Elliott Street in the Ladner Village core area from the Bridge Street to a pump station near the Ladner Community Centre on 51 Street. Project 1 generally consists of the supply and installation of approximately 957m of 710mm diameter DR 17 HDPE sanitary forcemain. The majority of the pipeline has been designed to be installed via open cut with one segment being installed via directional drill. Some notable challenges include: To minimize groundwater concerns during construction, where possible, the design of the pipeline has been developed to minimize the depth of bury. However, dewatering at various segments due to seasonal ground water levels and perched groundwater atop of peat layers will likely be required. Well point dewatering and ground water treatment will likely be required at the tie-in locations, at locations where ground water is encountered, and at trenchless entry and exit pits. Other notable challenges include: Poor soil conditions Crossing of drainage/ irrigation channels and bypassing of flows as necessary Coordination and compliance with the Ministry of Transportation and Infrastructure (MOTI) requirements for work within the Highway 17 right-of-way Coordination and compliance with FortisBC for the trenchless crossing of a Transmission Pressure gas pipe Traffic management and control for all works adjacent to Highway 17 and near Progress Way Project 2 generally consists of the installation of approximately 460m of gravity sewer main in Ladner Village. The new sewer is currently under design and it is envisioned that the pipeline will be installed via open cut method. Some notable challenges include: Well point dewatering and ground water treatment will likely be required along the entire length of the sewer installation Challenges associated with poor soil conditions Coordination and compliance with Metro Vancouver utilities Coordination and compliance with third party utility companies (i.e. BC Hydro, FortisBC, Telus, etc.) Traffic Management and pedestrian control for all works Project 1: Tilbury Sanitary Forcemain Invitation to Tender Issued: February 22, 2022 Tender Submission: March 15, 2022 Contract Award: March 29, 2022 Construction start: April 4, 2022 Project completion: December 31, 2022 Project 2: Elliott Street Sewer & Watermain Upgrades Invitation to Tender Issued: November 1, 2022 Tender Submission: November 22, 2022 Contract Award: December 13, 2022 Construction start: January 3, 2023 Project completion: May 27, 2023

Award

Water / Sewer

$3,997,780.00

Public - City

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
64
Bidding Soon
2,213
All Active Projects
793
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 16, 2022

April 4, 2022

img_map_placeholder

Elliott St, Delta, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.