BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Fort Totten, North Dakota. Completed plans call for the renovation of a water / sewer project.

Site Directions: The work will be at 6 separate lift station locations in and around the communities of Fort Totten (4 sites) and St. Michael (2 sites) in Benson County, ND. All six sites are within 8 miles of each other at their furthest extents. Project Category Code: Generator, Sewer Pump Station, Electrical and Controls, Lift Stations/Lift Station Equipment Description: The scope of work includes but is not limited to furnishing all labor, equipment, and materials to construct/install six (6) standby generators and concrete support pads, six (6) automatic transfer switches, six (6) propane tanks and concrete pads, six (6) automatic transfer switches, 233 square yards of site work, six ( 6) instances of site electrical work, 213 linear feet of chain link fence removal, 294 linear feet of chain link fence installation, and five (5) 12' wide double swing gates, and all other incidentals required to complete the work as specified at 6 lift station locations on the Fort Totten Reservation, Benson County, North Dakota. Pre-Bid Conference will not be held for this work. Failure to visit the Site and obtain a general feeling for the location of the described work will not relieve the Contractor from the requirement to furnish all materials and perform all jobs necessary to complete the Work in strict compliance with the Contract Documents.

Post-Bid

Water / Sewer

$100,000.00

Public - Federal

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
21
All Active Projects
7
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

April 8, 2022

img_map_placeholder

Multiple Locations, Fort Totten, ND


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.