BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a civil project in Fort Totten, North Dakota. Completed plans call for the construction of a road / highway; for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The scope of work includes furnishing all labor, equipment and materials for the construction of a new community lift station, 1,823 feet of 3-inch HDPE DR 9 sewer force main, 12 standard manholes, 4 shallow manholes, 1 lagoon inlet manhole, 15.65 VF of drop manholes, 4,337 feet of 8-inch PVC SDR 21 Restrained Greenline Sewer Main Pipe, 1,789.5 feet of 4-inch PVC SDR 21 Restrained Greenline Sewer Service Line Pipe, 590 feet of 4-inch non-cased PVC SDR 21 Restrained Greenline Pipe Directionally Drilled, 23 sewer wyes, 23 septic tank abandonments, 2,267.5 square yards of Road Restoration (gravel) and all other incidents to complete the work as stated in the specifications The Spirit Lake Tribe will accept bids from qualified contractors for the construction of the High Meadows Sewer Collection and Lift Station Project on the Fort Totten Reservation, Benson County, North Dakota. The scope of work includes furnishing all labor, equipment and materials for the construction of a new community lift station, 1,823 feet of 3-inch HDPE DR 9 sewer force main, 12 standard manholes, 4 shallow manholes, 1 lagoon inlet manhole, 15.65 VF of drop manholes, 4,337 feet of 8-inch PVC SDR 21 Restrained Greenline Sewer Main Pipe, 1,789.5 feet of 4-inch PVC SDR 21 Restrained Greenline Sewer Service Line Pipe, 590 feet of 4-inch non-cased PVC SDR 21 Restrained Greenline Pipe Directionally Drilled, 23 sewer wyes, 23 septic tank abandonments, 2,267.5 square yards of Road Restoration (gravel) and all other incidents to complete the work as stated in the specifications. The Owner will decide based on the unit prices. The total contract price will not be increased without prior authorization from the Owner via the change order process Any questions regarding the above should be directed to the TERO and Tax Department Office: Shelly Luger, TERO Director - P: 701-766-1356, F: 701-766-4592 - (tero@gondtc.com) Joan Black, Secretary of TERO- P: 701-766-4707, F: 701-766-4592-(joanb@gondtc.com) Gerard Thompson, Compliance Officer of TERO-P: 701-766-1240, F: 701-766-4592 - (gerardt@gondtc.com) Myra K. Hunt, Acting Tax Director, - P: 701-766-1265, F: 701-766-4592 (slt-taxdir@spiritlakenation.com) or (mkh.slttax@gondtc.com) Question Deadline 07/12/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other

Post-Bid

Water / Sewer

$1,422,000.00

Public - Federal

New Construction, Paving, Site Work

34

11

2

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
21
All Active Projects
7
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2024

September 23, 2024

img_map_placeholder

To Be Determined, Fort Totten, ND


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.