EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Union, Missouri. Completed plans call for site work for a water / sewer project.

The Contractor and all subcontractors will be required to comply with all applicable State Regulations including Equal Employment Opportunities, Non-segregated Facilities, Prevailing Wage Rates and Affirmative Action Requirements, and all other work incidental thereto as described in the Contract Documents. Any person signing a contract to work on the construction of public works for any public body shall provide a ten-hour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees which includes a course in construction safety and health approved by OSHA or a similar program approved by the department which is at least as stringent as an approved OSHA program. All employees are required to complete the program within sixty days of beginning work on such construction project. The Owner reserves the right to waive any informalities or irregularities and to reject any or all bids. Each bidder must deposit with his bid security in the amount, form and subject to the conditions provided in the information for bidders. No bidder may withdraw his bid within thirty (30) days after the actual date of the opening thereof.

Award

Water / Sewer

$800,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
69
Bidding Soon
781
All Active Projects
409
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

March 31, 2022

img_map_placeholder

10 E Locust St, Union, MO

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Interior Coating of Water Storage Tank #6

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.