BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, outdoor lighting and addition to a mixed-use development in Los Lunas, New Mexico. Completed plans call for the addition of a 19,642-square-foot detention facility; for the demolition of a detention facility; for site work for a detention facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and water / sewer project.

The work includes: site grubbing, over excavation and imported / blended soil fill, auger cast concrete piles, concrete grade beams, concrete slabs, concrete unit masonry bearing walls, steel joists, steel deck roof support, and an insulated TPO roof system. Exterior finish consists of exterior insulation and finish system (EIFS). Interior partitions consist of light gauge steel studs with gypsum wallboard along with concrete unit masonry walls. Finishes include: polished concrete, rubber athletic flooring, resilient accessories, polyaspartic concrete coating, carpet tile and walk off carpet, tiled walls, window blinds, pipe railing with infill panels, and painted walls. Fenestration consists of aluminum storefront windows and doors, hollow metal doors and frames, and skylights. Interior openings consist of hollow metal frames with wood and hollow metal doors. Specialties include: athletic equipment including retractable basketball goals, volleyball sleeves, standards and nets, athletic scoreboards, fire extinguisher cabinets and fire extinguishers, toilet partitions and accessories, interior signage, and dimensional signage. HVAC system consists of gas fired roof top units providing heating and cooling. Plumbing fixtures consist of toilet room fixtures, hot water heating and tempering, and trench drainage. Electrical includes LED lighting, emergency lighting, convenience receptacles, power to HVAC equipment, and low voltage data. Fire suppression sprinkler installation throughout the addition, fed from the existing fire riser. Fire alarm expansion from the existing fire alarm panel. Site work includes construction of a fire access road and support concrete pad, concrete sidewalks, retaining wall, site lighting, site furnishings, and minor landscaping. Utilities include: installation of new electrical service, installation of new sewer line, and installation of a new natural gas line. 1. Project includes the construction of a 19,642 SF gym addition to the existing recreation center at Daniel Fernandez Park located at 1103 NM 314 in Los Lunas NM. The work includes: site grubbing, over excavation and imported / blended soil fill, auger cast concrete piles, concrete grade beams, concrete slabs, concrete unit masonry bearing walls, steel joists, steel deck roof support, and an insulated TPO roof system. 2. Exterior finish consists of exterior insulation and finish system (EIFS). Interior partitions consist of light gauge steel studs with gypsum wallboard along with concrete unit masonry walls. 3. Finishes include: polished concrete, rubber athletic flooring, resilient accessories, polyaspartic concrete coating, carpet tile and walk off carpet, tiled walls, window blinds, pipe railing with infill panels, and painted walls. 4. Fenestration consists of aluminum storefront windows and doors, hollow metal doors and frames, and skylights. 5. Interior openings consist of hollow metal frames with wood and hollow metal doors. 6. Specialties include: athletic equipment including retractable basketball goals, volleyball sleeves, standards and nets, athletic scoreboards, fire extinguisher cabinets and fire extinguishers, toilet partitions and accessories, interior signage, and dimensional signage. 7. HVAC system consists of gas fired roof top units providing heating and cooling. Plumbing fixtures consist of toilet room fixtures, hot water heating and tempering, and trench drainage. Electrical includes LED lighting, emergency lighting, convenience receptacles, power to HVAC equipment, and low voltage data. 8. Fire suppression sprinkler installation throughout the addition, fed from the existing fire riser. Fire alarm expansion from the existing fire alarm panel. 9. Site work includes construction of a fire access road and support concrete pad, concrete sidewalks, retaining wall, site lighting, site furnishings, and minor landscaping. 10. Utilities include: installation of new electrical service, installation of new sewer line, and installation of a new natural gas line.

Post-Bid

Jails / Prisons

$5,706,000.00

Public - City

Addition, Demolition, Outdoor Lighting, Paving, Site Work

82

51

50

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
4
Bidding Soon
154
All Active Projects
68
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

May 16, 2022

img_map_placeholder

1103 NM-314, Los Lunas, NM


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.