Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Maplewood, Minnesota. Conceptual plans call for site work for a water / sewer project.
The townhome development of Carriage Homes of Maple Hills is located north of Parkway Drive and west of Highway 61. Part of the development contains a large pond located within the ring road of Maple Hills Drive. This basin takes stormwater runoff from the surrounding properties. The basin is a no outlet storm basin. As part of the original development a storm sewer force main was installed from the basin out to Parkway Drive for future connection to the City's storm sewer system to provide a way to pump down the level of water in the storm basin. The proposed project will make the connection to the City's storm sewer system and allow the City to maintain the pond system. The existing storm sewer basin does not have an outlet that allows the City to maintain the water levels within the basin. Stronger and more intense storm events are taking place due to climate change. The proposed project will extend the existing storm sewer from the intersection of Maple Hills Drive and Parkway Drive to the existing storm sewer system located at the intersection of Parkway Drive and Highway 61. This will allow staff to pump down the water level in the pond, so there is adequate volume available for large storm events. This section of Parkway Drive is under the jurisdiction of Ramsey County. City staff have been coordinating with Ramsey County throughout 2021 on this project. This coordination has led to a proposed joint project. The proposed project includes the storm sewer force main to serve the Maple Hills townhomes, a bituminous pavement preservation project on Parkway Drive, and a new sidewalk segment that will connect the Maple Hills townhomes to the existing bust stop located at the intersection of Larpenteur Avenue and Parkway Drive. The proposed sidewalk segment is listed as a priority pedestrian corridor in the City's 2040 Comprehensive plan. The proposed project will be funded by the City and Ramsey County. As of April 22, 2022, this project is included in the City of Maplewood FY 2022-2026 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$403,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2022
Maple Hills Dr E, Maplewood, MN
Related To This Project
Maplewood, MN
--
Maplewood, MN
Bid Date: Oct 23 2020
Maplewood, MN
Bid Date: Apr 12 2022
Maplewood, MN
Bid Date: May 06 2022
Maplewood, MN
Bid Date: Apr 13 2022
Maplewood, MN
Bid Date: May 11 2022
Maplewood, MN
Bid Date: Dec 16 2022
Maplewood, MN
Bid Date: Jul 12 2022
Maplewood, MN
--
Maplewood, MN
Bid Date: Dec 01 2022
Maplewood, MN
Bid Date: Jan 22 2020
Maplewood, MN
--
Saint Paul, MN
--
Rosemount, MN
Bid Date: Apr 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.