Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 18, 2022 at 7:00 PM
Updated November 15, 2023
Site work for a water / sewer project in Santa Cruz, California. Conceptual plans call for site work for a water / sewer project.
The City of Santa Cruz Water Department is seeking design support for bank stabilization and associated environmental regulatory permitting support on along the right bank (looking downstream) of Branciforte Creek. On August 31, 2021 an 8" cast iron, high- pressure, treated-water pipeline ruptured scouring a portion of the Branciforte Creek bank and an approximately 12' long section of stacked broken concrete retaining wall which was providing erosion protection to the Santa Cruz County bridge abutments and Branciforte Drive. The pipeline break also undermined the support surrounding a thrust block to an adjacent 10" high-pressure water main. In addition to the bank stabilization component of this project, the environmental regulators indicated that compensatory mitigation would be required for the 17 cubic yards of streambank material that was discharged into Branciforte Creek as a result of the pipeline break. The scope of work should include design and/or an approach to mitigate the initial break impacts and any project impacts. The method of Contractor Selection has not been Determined at this time
Conceptual
Water / Sewer
$500,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2023
855 Branciforte Dr, Santa Cruz, CA
Related To This Project
Santa Cruz, CA
Bid Date: Feb 17 2022
Santa Cruz, CA
Bid Date: Dec 17 2021
Santa Cruz, CA
Bid Date: Feb 24 2022
Santa Cruz, CA
Bid Date: Mar 01 2022
Santa Cruz, CA
--
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Mar 10 2022
Santa Cruz, CA
Bid Date: Mar 08 2022
Santa Cruz, CA
--
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Jan 24 2022
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Jan 18 2022
Santa Cruz, CA
Bid Date: Feb 03 2022
Santa Cruz, CA
Bid Date: Jan 07 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
