Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 18, 2025 at 7:00 PM
Updated February 19, 2025
Site work and renovation of a civil project in Palatine, Illinois. Conceptual plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.
Update:https://www.palatine.il.us/ArchiveCenter/ViewFile/Item/1658 This program is designed to provide maintenance and improvements to both wells (backup source of water) and water pumping stations. At the present time, the Village has 5 wells that have pumping capacity of roughly 4,000,000 gallons per day. It also has 7 water pumping stations throughout the system. CY 2025 - North Supply Pump Station Motor Control Replacement and Surge Arrestor Installation. CY 2026 - Countryside Pump Station Motor Control Replacement and Surge Arrestor Installation CY 2027 - Heron Drive Well (#10) Inspection and Repair. CY 2028 - Old Hicks Road Well (#15) Inspection and Repair. CY 2029 - Smith Street Well (#7) Inspection and Repair. Future - Illinois Avenue Well (#5) Inspection and Repair. Project is included Village of Palatine Fiscal Year 2025-2029 Page No 302 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.palatine.il.us/ArchiveCenter/ViewFile/Item/1512 This program is designed to provide maintenance and improvements to both wells (backup source of water) and water pumping stations. At the present time, the Village has 5 wells that have pumping capacity of roughly 4,000,000 gallons per day. It also has 7 water pumping stations throughout the system. CY 2023 - North Supply Pump Station Motor Control Center Replacement CY 2024 - Countryside Pump Station Motor Control Center Replacement CY 2025 - South Supply Pump Station Motor Control Center Replacement CY 2027 - Maintain Well #15 (Old Hicks Rd) CY 2028 - Heron Drive Well (#10), inspect and repair $150,000, never pulled, drilled in 1979 CY 2029 - Smith Street Well (#7), inspect and repair $100,000, last inspected in 1973, drilled in 1968 CY 2031 - Illinois Avenue Well (#5), inspect and repair $175,000, last inspected in 2004, drilled in 1968 Project is included Village of Palatine 2023-2027 Capital Improvement Plan (CIP) Page 308 ____________________________________________________________________________________________________________________________________________________________________________________ This program is designed to provide maintenance and improvements to both wells (backup source of water) and water pumping stations. At the present time, the Village has 5 wells that have pumping capacity of roughly 4,000,000 gallons per day. It also has 7 water pumping stations throughout the system. CY 2022 - Install second variable frequency drives at four primary potable water pumping stations. Improves reliability and longevity of existing pumps CY 2023 - Maintain Well #15 (Old Hicks Rd) CY 2024 - Smith Street Well (#7), inspect and repair $100,000, last inspected in 1973, drilled in 1968 CY 2026 - Heron Drive Well (#10), inspect and repair $150,000, never pulled, drilled in 1979 CY 2028 - Illinois Avenue Well (#5), inspect and repair $175,000, last inspected in 2004, drilled in 1968. To prolong station life and reduce problems and failures To reduce operating costs and improve efficiencies To maintain vital systems necessary for the public health and welfare To provide proper equipment to operate a three-zone system Project is included Village of Palatine FY 2022-2026 CIP . As of February 09, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$800,000.00
Public - City
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2025
Multiple Locations, Palatine, IL
Related To This Project
Palatine, IL
Bid Date: Feb 21 2025
Palatine, IL
Bid Date: Mar 04 2025
Palatine, IL
Bid Date: Mar 04 2025
Palatine, IL
Bid Date: Nov 19 2025
Palatine, IL
Bid Date: Mar 03 2025
Palatine, IL
Bid Date: Mar 04 2025
Palatine, IL
Bid Date: Feb 28 2025
Palatine, IL
Bid Date: Feb 28 2025
Palatine, IL
Bid Date: Apr 01 2025
Palatine, IL
Bid Date: Feb 21 2025
Palatine, IL
Bid Date: Mar 04 2025
Palatine, IL
Bid Date: Feb 14 2025
Palatine, IL
--
Palatine, IL
Bid Date: Feb 13 2025
Palatine, IL
Bid Date: Feb 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
