BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2025 at 7:00 PM

Updated February 19, 2025

Site work and renovation of a civil project in Palatine, Illinois. Conceptual plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

Update:https://www.palatine.il.us/ArchiveCenter/ViewFile/Item/1658 This program is designed to provide maintenance and improvements to both wells (backup source of water) and water pumping stations. At the present time, the Village has 5 wells that have pumping capacity of roughly 4,000,000 gallons per day. It also has 7 water pumping stations throughout the system. CY 2025 - North Supply Pump Station Motor Control Replacement and Surge Arrestor Installation. CY 2026 - Countryside Pump Station Motor Control Replacement and Surge Arrestor Installation CY 2027 - Heron Drive Well (#10) Inspection and Repair. CY 2028 - Old Hicks Road Well (#15) Inspection and Repair. CY 2029 - Smith Street Well (#7) Inspection and Repair. Future - Illinois Avenue Well (#5) Inspection and Repair. Project is included Village of Palatine Fiscal Year 2025-2029 Page No 302 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.palatine.il.us/ArchiveCenter/ViewFile/Item/1512 This program is designed to provide maintenance and improvements to both wells (backup source of water) and water pumping stations. At the present time, the Village has 5 wells that have pumping capacity of roughly 4,000,000 gallons per day. It also has 7 water pumping stations throughout the system. CY 2023 - North Supply Pump Station Motor Control Center Replacement CY 2024 - Countryside Pump Station Motor Control Center Replacement CY 2025 - South Supply Pump Station Motor Control Center Replacement CY 2027 - Maintain Well #15 (Old Hicks Rd) CY 2028 - Heron Drive Well (#10), inspect and repair $150,000, never pulled, drilled in 1979 CY 2029 - Smith Street Well (#7), inspect and repair $100,000, last inspected in 1973, drilled in 1968 CY 2031 - Illinois Avenue Well (#5), inspect and repair $175,000, last inspected in 2004, drilled in 1968 Project is included Village of Palatine 2023-2027 Capital Improvement Plan (CIP) Page 308 ____________________________________________________________________________________________________________________________________________________________________________________ This program is designed to provide maintenance and improvements to both wells (backup source of water) and water pumping stations. At the present time, the Village has 5 wells that have pumping capacity of roughly 4,000,000 gallons per day. It also has 7 water pumping stations throughout the system. CY 2022 - Install second variable frequency drives at four primary potable water pumping stations. Improves reliability and longevity of existing pumps CY 2023 - Maintain Well #15 (Old Hicks Rd) CY 2024 - Smith Street Well (#7), inspect and repair $100,000, last inspected in 1973, drilled in 1968 CY 2026 - Heron Drive Well (#10), inspect and repair $150,000, never pulled, drilled in 1979 CY 2028 - Illinois Avenue Well (#5), inspect and repair $175,000, last inspected in 2004, drilled in 1968. To prolong station life and reduce problems and failures To reduce operating costs and improve efficiencies To maintain vital systems necessary for the public health and welfare To provide proper equipment to operate a three-zone system Project is included Village of Palatine FY 2022-2026 CIP . As of February 09, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$800,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
308
Bidding Soon
3,820
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

Multiple Locations, Palatine, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.