BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2025 at 7:00 PM

Updated February 19, 2025

Site work and renovation of a mixed-use development in Palatine, Illinois. Completed plans call for site work for a bridge / tunnel; water / sewer project; and for the renovation of a educational facility.

As part of the base bid, the heating contractor shall provide all labor, materials, and equipment to replace the condensate piping and pipe support racks between tunnel branches to bldgs F&P in the utility tunnel and the steam and condensate valves located where the tunnel branch to bldg. P meets the utility tunnel. The location of the base bid work is identified as Work Area 0 on dwg. G-3. Alternate H-1, work area 1, on dwg. G-3 calls for replacing two expansion loops with expansion joints in the utility tunnel. Alternate H-2 includes the replacement of the condensate piping in the tunnel branch to building P, the condensate piping in the mechanical room of building P, and a condensate line between buildings P and L mechanical rooms. The work for the base bid and alternate H-1 will require a complete shutdown of the utility tunnel. With the new isolation valves at the entrance to tunnel branch P, work can be completed in buildings P&L without shutting down the utility tunnel. The work for the base bid and alternate H-1 work shall be coordinated with Harper College facilities management. Work for alternates H-2 will also require coordination with the facility (Using Agency). The contractor must keep pipe fitters on site to ensure all new piping and valves hold without leakage. The quality of the heating work shall be complete in every aspect, tested, and satisfactory to the Using Agency, CDB, and the A/E, and following State and Federal laws governing this installation. For additional assistance related to the e-Builder system, email CDB.eBuilderSupport@illinois.gov. Questions submitted through the e-Builder module will not reviewed or responded to. Meeting participants will not be able to ask questions either verbally or via the meeting's chat feature : The participation goal percentages on the amount of the contract awarded by CDB for this project are 20% MBE, 3% WBE, and 2% PVBE combined Contractor shall submit a completed Illinois Works Jobs Program Act Apprenticeship Initiative Budget Supplement within ten (10) calendar days after CDB's issuance of the Authorization to Proceed. Special consideration should be made by the contractor to provide a complete and thorough estimate of all the project labor hours for the project. Total labor hours should be listed by prevailing wage category

Post-Bid

Bridges / Tunnels

$400,000.00

Public - State/Provincial

Renovation, Site Work

15

16

5

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
540
Active Projects
308
Bidding Soon
3,834
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 20, 2025

Project location map

1200 W Algonquin Rd, Palatine, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.