Demolition and site work for an educational facility in Brookings, South Dakota. Completed plans call for the demolition of a educational facility.

https://sdsucollegian.com/22996/uncategorized/scobey-hall-to-be-demolished-this-month/ Scobey Hall, a building on the far west edge of the South Dakota State University campus, will be torn down this month after sitting empty for five years. The building was permanently closed in spring 2017 because of a variety of problems, forcing faculty offices, classrooms and academic departments to find new homes. During the 2019 legislative session, the South Dakota Board of Regents sponsored House Bill 1038 in an effort to get clearance for the demolition. That bill passed. According to a bill brief from SDBOR, Scobey Hall needs substantial repairs, “including items such as heating, cooling and chiller replacement, asbestos abatement, basement and sump system repair, elevator, fire, and electrical service upgrades, accessibility and life safety code upgrades,” making it a prime demolition candidate. Since it was decided that the building would be demolished, legislative action was needed. HB 1038 granted the university the approval needed to tear the building down. Matthew Weiss, an architect and project manager for designArc Group, is the project manager for the Scobey Hall demolition. He said the initial architectural demolition estimate was about $470,000, but the actual cost to demolish the building will be $439,870. The bill brief said the cost “will be paid for using ‘other funds’ from local university or private sources.” “The cost to abate the asbestos was projected to be more expensive than it would be to demolish the facility,” Weiss said. Weiss has not heard any negative comments about the demolition. He has spoken to SDSU alumni who have had experiences in Scobey, and he said they are excited to hear that the hall is being torn down. Weiss said he thinks it’s important to honor the building by keeping blueprints and other documents to remember important dates and specific details of Scobey. “As an architect, I generally don’t enjoy the idea of demolishing a historic building,” Weiss said. “So, to me, it is important to preserve the history of the building as best as I can on paper.” According to Weiss, as of now, SDSU does not have plans for the Scobey Hall site. It will become a green space. The 43,687 square-foot Scobey Hall was built in 1940, and it has served SDSU in several ways. It was originally used as the men’s dormitory for agriculture and mechanic arts until 1973. Until it closed in 2017, it housed classrooms and several academic departments, including the Department of Economics, the Department of Psychology and the Department of Sociology and Rural Studies. DesignArc Group, the local architecture firm, was selected last July to do the demolition, according to Weiss, and they will work alongside SDSU Facilities and Services to get the building torn down. A contractor that will perform the demolition has also been selected through a competitive bid process. Dennis Hedge, the provost and vice president of student affairs, was involved in the relocation of faculty when Scobey closed. The departments were moved to other campus buildings until space was available. Hedge said that until the renovation of Harding Hall was complete, the economics department was relocated to the DePuy Military Hall. Hansen Hall became the location for the departments of sociology and rural studies and psychology, where they stayed until the two departments formed a new school and found a permanent residence in the Agricultural Engineering building last semester. “The challenge in identifying permanent homes was identifying spaces that would allow departments to move in their entirety as a unit and sequencing of construction projects, thus freeing spaces for the relocation of the departments,” Hedge said. ____________________________________________________________ 1.The plans and specifications are the sole property of the State; 2.Any copies of the plans and specifications obtained from the State or its agent, will be returned to the office of SDSU Facilities & Services immediately after the State provides notice that the bidder will not be awarded a contract, or thirty (30) days after the bid opening for the project, whichever occurs first; 3.Any copies of the plans and specifications made by the bidder will be destroyed immediately after the State provides notice that the bidder will not be awarded a contract, or thirty (30) days after the bid opening for the project, whichever occurs first; 4.If the bidder does not submit a bid, bidder will fulfill the requirements of 2 and 3 above on or before the date of the bid opening; 5.The plans and specifications are to be used only with respect to this project and are not to be used for any other project or purposes other than preparing a bid for this project; 6.The plans and specifications will not be disseminated to any person or entity for purposes other than obtaining pricing information without the express written approval of the State; 7.All information contained in the plans and specifications is confidential; and 8.Should the bidder disseminate the plans and specifications to an individual or entity for purposes of obtaining pricing information , the bidder will require that individual or entity to adhere to the terms set forth herein. The bidder, however, assumes no liability for the misuse of the plans and specifications by such third party or such third partys failure to comply with the provisions contained herein. Should the bidder be awarded a contract for construction of the project, bidder does not need to return or destroy plans and specifications until after completion of the project. Each bid in excess of $100,000.00 must be accompanied by a certified check, cashiers check or draft in the amount of 5% of the base bid and all add alternates and drawn on a State or National Bank or a 10% bid bond issued by a surety authorized to do business in the State of South Dakota and made payable to the Board of Regents of the State of South Dakota. South Dakota State University reserves the right to reject any or all bids and to waive any irregularities therein. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project has a value range of $400K-$600K.

Bid Results

Educational

$439,870.00

Public - State/Provincial

Demolition, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
9
Bidding Soon
165
All Active Projects
70
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2022

March 24, 2022

img_map_placeholder

1451 Stadium Rd, Brookings, SD


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.