BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a civil project in Leonard, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of June 12th, 2024, this project has been awarded. It is unclear if construction has begun at this time. Attempts are ongoing to confirm the project status. The North Texas Municipal Water District is soliciting for competitive sealed proposals from qualified vendors for the Bois d'Arc Lake Raw Water Pump Station Phase II Honey Grove, TX. NTMWD has chosen the use of the CMAR project delivery method for this Project. The procurement and the provision of Services will be in accordance with Texas Government Code Chapter 2269 and this RFQ. Selection of the CMAR will be made using a two-step procurement and selection process. The NTMWD has delegated its authority under this Chapter regarding all actions required by this Chapter except for execution of the CMAR agreement to the Executive Director or her designees. Based on the preliminary work done to date, the conceptual construction cost value of this Project is $436 million. F&N Job No. : NTD16260 PROJECT NO. 101-0600-21 Leonard Water Treatment Plant Phase II PROJECT NO. 101-0601-21 Leonard Water Treatment Plan Terminal Storage Reservoir Phase II PROJECT NO. 101-0602-21 Bois d'Arc Lake Raw Water Pump Station Phase II PROJECT NO. 101-0603-22 Leonard Water Treatment Plant High Service Pump Station - South The North Texas Municipal Water District (NTMWD) provides wholesale water services to 80 communities and more than 2.2 million residents of North Texas. Updated demands and need for redundancy have accelerated the need for Bois dArc Lake Program Phase 2 expansion. The Project will consist of: 1) A second 70 million gallons per day (MGD) phase of the Leonard Water Treatment Plant for a total capacity of 140 MGD which consists of the following processes: pre-oxidation with chlorine dioxide; coagulation, flocculation and sedimentation; ozonation; biologically active filtration; pH adjustment; free chlorine disinfection; chloramination; fluoridation and clear well storage. 2) Expansion of the Bois d Arc Lake (BDL) Raw Water Pump Station (RWPS). 3) A new High Service Pump Station -South (HSPS-S) in addition to expansion the High Service Pump Station - North (HSPS-N) which is currently under construction. 4) Addition of a second cell (210-million-gallon (MG) capacity) at the Terminal Storage Reservoir (TSR) at the Leonard Water Treatment Plant (WTP) site. For further Project information, please see RFQ Section 5.1 Additional Information Attachment 1: Project Scopes of Work and Additional Background Project Information. Please direct all questions related to this RFQ to the Q&A Section.

Award

Water / Sewer

$75,784,400.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

11

17

2

9

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
69
Bidding Soon
3,497
All Active Projects
1,389
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2022

June 28, 2024

img_map_placeholder

391 Co Rd 4965, Leonard, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.