BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Beaver Dam, Wisconsin. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of April 4, 2022, the project has been awarded. A timeline for construction has not been confirmed. construction of 2022 Walnut Street Reconstruction (McKinley St to Termini) The work for which bids are asked includes the following: 55 LF of 15"-18" diameter RCP storm sewer; 1,530 LF of concrete curb/gutter; 12,000 SF of concrete sidewalk and driveway apron; 340 TON of asphalt pavement; 3,150 SY of crushed aggregate base and geogrid; 1,300 SY of topsoil and sodding; 5 EA street lighting units plus 741 LF of lighting conduit, and 1 LS meter pedestal and service panel; 50 LF of epoxy pavement marking; as well as all related work including unclassified excavation, erosion control, and traffic control. Direct all bidding inquiries to Engineer's Project Manager, Nate Rego, at (920) 392-5135 No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. No bid may be withdrawn within 60 day after the actual date of the opening thereof. Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by Local wage rates. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the City of Beaver Dam.

Award

Roads / Highways

$392,797.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
37
Bidding Soon
851
All Active Projects
347
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2022

May 9, 2022

img_map_placeholder

Walnut St, Beaver Dam, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.