BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2022 at 8:00 PM

Updated September 15, 2023

Site work and renovation of a water / sewer project in Albia, Iowa. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Water and Wastewater Facilities, Buildings Rehabilitation/Renovation, Sanitary Sewer (Gravity), Sewer Pump Station, Sewer Force Main, Electrical and Controls, Instrumentation, Culverts, Waterways, Stormwater Channels, Construction, Demolition/Building Removal/Hauling/Salvage, Concrete/Formed/Flatwork/Foundation, Electrical Installation/Construction, Fittings and Valves, Erosion Control/Slope, Bank Stabilization, Grade and Surface, Excavation, Stormwater Improvements, Erosion Control - Temporary, Culinary Water Improvements, Lift Stations/Lift Station Equipment, Plumbing, Heating, Ventilation, Air Conditioning (HVAC), Watershed Protection/Riprap, Sewer and Water Construction, Sitework/Excavating and Grading, Roofing, Painting, Water/Wastewater Infrastructure, Grubbing & Clearing. There are two wastewater treatment sites that both include the retrofitting of the existing lagoon cells with an upgraded aerated lagoon system followed by the installation of submerged, fixed-film media reactors. The reactors consist of a clean gravel bed that provides surface area for nitrifying bacteria to grow and populate. An ultraviolet (UV) disinfection system on each of the discharge lines will also be installed to inoculate E.coli prior to final discharge. Work also includes structures, grading, utilities, controls, seeding, maintenance and compliance with a stormwater pollution protection plan, and all other miscellaneous work required to complete the project in accordance with plans and specifications. The project includes the sludge dredging of all cells with appropriate disposal, and the decommissioning of one cell. This project also includes North site access upgrades to provide a wide enough roadway that allows truck access to the North wastewater treatment site. Also includes all other miscellaneous work to complete this section in accordance with plans and specifications. If the plans and specifications are not returned within fourteen days after award of the project and in a reusable condition, the deposit shall be forfeited. Plans and specifications may also be obtained by download from the ISG website.

Award

Water / Sewer

$2,500,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
105
Bidding Soon
1,294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

July 1, 2022

Project location map

Multiple Locations, Albia, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.