BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Toledo, Ohio. Completed plans call for the renovation of a water / sewer project.

Preferences MBE - Minority-Owned Business Enterprise WBE - Woman-Owned Business Enterprise Local - Local Business Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 07/14/2022 12:00 PM (EDT) The City of Toledo is seeking a contractor to remove, rebuild, and reinstall a 36-inch bonneted knife gate valve at the Bay View Pump Station, 3900 North Summit St., Toledo Oh. In order to be responsive, all bids must have the following with submittal: o Project Paperwork* o Line Items - will auto populate with e-bid o Bid Guaranty (bid bond or certified check / cashier's check on a solvent bank) - see instructions below o Signed Contract by the Vendor* o Child Support Affidavit* o Bureau of Worker's Compensation Certificate o Insurance Certificate, naming the City of Toledo as an additional insurer - insurance requirements are available on the "Documents" tab of this bid. *Located on the "Documents" tab of PlanetBids If using a check as the bid guaranty, the check must be scanned and uploaded with your bid. In addition, the check must be received by the Division of Purchases and Supplies no later than the due date and time to be deemed responsive. No Company / No Personal checks will be accepted. Checks shall be made payable to "City of Toledo." If your company does not provide a bid guaranty, your bid submittal will be deemed non-responsive. (TMC 187.09) City forms must be filled out and attached to the bid: Project Paperwork (Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; MBE Good Faith and Goal Commitment; EEO Form; Primary and Subcontractor Forms and Debarment and Suspension Certificate); Signed Contract by Vendor CEO/President; Current Worker's Compensation Certificate; Insurance Certificate listing the city of Toledo as an additional insurer; and Child Support Affidavit. The following items will be required upon awarding the contract: Any additional Insurance or Bonding as Required Special Notices Prevailing Wages are required for this project. It is the obligation of a contractor or subcontractor to make payment in accordance with the prevailing wage determinations. Current prevailing wage rates may be found on the Division of Purchases and Supplies site Scope of Work: a. The City of Toledo will secure, lock-out, b. The Contractor will remove the Rotork actuator from the valve. c. The Contractor, in coordination with The City, will shut down and isolate necessary pumps to remove the Knife gate. d. After the valve is removed, the contractor will blind flange both ends of the exposed piping so the pumps can be put back in service. e. The contractor will transport the valve to an appropriate shop for evaluation. f. After the shop evaluation, the contractor will submit a report to the City outlining all recommendations for replacement/refurbishment. g. The City will evaluate the report and approve the valve replacement/refurbishment work. (This work will be paid on a Time and Material basis) h. The Contractor, in coordination with The City, will shut down and isolate necessary pumps to replace the refurbished Knife gate. i. The Contractor will reinstall the actuator, restore power, and put the valve back inservice

Bid Results

Water / Sewer

$142,960.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
93
Bidding Soon
1,382
All Active Projects
579
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2022

August 18, 2022

img_map_placeholder

3900 N Summit St, Toledo, OH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.