BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in Craig, Colorado. Completed plans call for site work for a playground / park / athletic field.

Eng Project # 22-017 Construct an ADA Accessible, public fishing dock at Browns Park NWR 1. 100% Small Business Set-aside, NAICS Code 236220 - Commercial and Institutional Building Construction, Size Standard $39.5M. This solicitation is a request for proposal under FAR Part 13 Simplified Acquisition Procedures and awarded as a firm-fixed price construction contract. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicates that the Government may communicate with offers as allowed under Simplified Acquisition Procedures. 2. IAW FAR 36.204 the magnitude of this construction project is anticipated to be between $25,000 and $100,000. 3. Contractors shall follow instruction in section L of the solicitation. 4. Any request for information or request for a site visit must be received no later than 18 February 2022 via e-mail at miguel_martinez@fws.gov by 12:00 PM MST. 5. Proposals must be received via e-mail to Miguel Martinez at miguel_martinez@fws.gov no later than 28 February 2022 by 5:00 PM MST Period of Performance: 03/14/2022 to 03/14/2023 Construct an ADA Accessible, public fishing dock at Browns Park NWR; The contractor shall furnish all labor, expertise, supervision, labor, materials, supplies, and equipment necessary to complete the work as defined by the approved construction specifications, statement of work, and drawings. All material shall be approved and conform with specifications. Period of Performance: 365 Days after notice to proceed. The Contractor shall be required to (a) commence work under this contract within [10] ten calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than three hundred and sixty-five [365] days. The time stated for completion shall include final cleanup of the premises. The quality control of services provided under this contract shall be based on: (i) operational requirements and standards contained in this contract; (ii) work performance; and (iii) productivity requirements and standards, and (iv) data base information resource development and maintenance standards. The Contractor shall implement and adhere to the quality control plan provided as part of its Technical Proposal. The quality control plan shall be written by the Contractor's Quality Control Manager and approved by his/her immediate supervisor. The Contractor is solely responsible for quality control of services that it provides. The Contractor's quality control program, which is embodied in the quality control plan, shall include, but not be limited to, the following. A monitoring and inspection system covering all the services listed in the Performance Requirements Summary. It must specify the elements of work performance to be monitored and inspected, either on a scheduled or unscheduled basis; the methods to be used; frequency of monitoring and inspection; the format and content of records and reports to be generated; and the title(s) of the individual(s) who will perform the monitoring and inspection. It shall include, but is not limited to: o the method for identifying and preventing deficiencies in the quality of services performed before the level of performance can become unsatisfactory. o the administrative procedures to be followed for reporting to the Contracting Officer's Technical Representative (COTR); and for responding to operational problems or complaints concerning work performance, qualifications, or other complaints about Contractor personnel; and o preparation of system of on-site records of all inspections conducted by the Contractor and the corrective action(s) taken. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Playgrounds / Parks / Athletic Fields

$100,000.00

Public - Federal

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
4
Bidding Soon
70
All Active Projects
26
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2022

March 14, 2022

img_map_placeholder

1318 CO-318, Craig, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.