Renovation of a laboratory facility in Garretson, South Dakota. Completed plans call for the renovation of a laboratory facility.

The Work of Project is defined by the Contract Documents and consists of, but is not limited to, the following: 1. Selective demolition and modification of concrete slabs, flooring, and ceilings. 2. Construction of 2-HR rated wall shafts as piping chases. 3. Installation of 2x2 access panel. 4. Replacement of existing cooling towers. 5. Replacement of condenser water and chilled water piping. 6. Addition of new 300-ton chiller for redundancy. This is an announcement directing interested parties to the SAM web page at https://www.sam.gov where details of a U.S. Geological Survey (USGS) Request for Proposal (RFP) 140G0122R0005 may be viewed. This RFP constitutes the only solicitation. This RFP is a Total Small Business Set-Aside. Discounted Open Market Firm-Fixed Price proposal packages are being requested for USGS EROS Construction Services. The posted RFP contains a description of the Statement of Work, Instructions to Vendors, DOL Wage Determination, Applicable Clauses, and Attachments A-L. Disclosure of Magnitude in accordance with FAR 36.204: Between $1,000,000 and $5,000,000. All vendors who can meet this requirement, have a valid Dun & Bradstreet Number (DUNS) and are registered in SAM are invited to submit electronic proposals for this posted RFP. The Site Visit will be held Tuesday, March 8, 2022 at 12:00pm Central Time at the USGS in Sioux Falls, SD. Please follow the instructions within the RFP to submit the proper documentation to attend the Site Visit. All questions shall be submitted via email to ndemby@usgs.gov no later than 12:00PM EST, Tuesday, March 15, 2022. The PERIOD OF PERFORMANCE is: Date of Award through 180 days (6) months unless the other options are exercised. This period of performance includes the lead time it might take the contractor submit the required performance and payment bonds and to mobilize and/or obtain the products and materials needed to complete the entire scope of work. Site Visit Details: Date: 03/08/2022 Time: 12:00 P.M. Central Time Location: U.S. Geological Survey, EROS Mundt Federal Building 47914 252nd Street, Sioux Falls SD 57198 Valid Government-issued identification is required to enter the building. Please use the Visitor's Entrance at the prescribed time only. Vendors must provide the attached completed security document and a business license copy prior to the site visit in order to receive project drawings. Any vendor who does not provide the required documents will not be provided drawings (if any). All vendors interested in attending the site visit shall send a confirmation email to: Nicole Demby: ndemby@usgs.gov Site Visit confirmation email shall include: -Company Name -Number of Attendees -Names of Attendees -Attachment 1: Completed Security Document -Attachment 2: Copy of Business License *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Laboratories

$5,000,000.00

Public - Federal

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Air Cleaning Devices, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Special Purpose Lighting, Security Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
10
Bidding Soon
219
All Active Projects
91
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2022

June 8, 2022

img_map_placeholder

47914 252nd St, Garretson, SD

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Earth Resources Observation and Science Center (EROS) Phase I: EROS Fluid Coolers Design Services

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.