BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 30, 2022 at 8:00 PM

Updated November 15, 2023

Renovation of a stadium in Akron, Ohio. Completed plans call for the renovation of a stadium.

James A. Rhodes Curtain Wall and Exterior Lighting Replacement Bid tabulations will be posted no later than 5:00 p.m. on the day bids are opened thru EDGE Participation Goal: 5% of contract. General $ 410,500.00 This project involves the removal and replacement of the mezzanine-level curtain wall system and the replacement of the exterior building lighting for the James A. Rhodes building located at the main campus of Akron University. The curtain wall system replacement includes structural and plumbing work along with minor architectural work. The exterior lighting replacement involves electrical upgrades to the fixtures and control rooms. Refer to the drawings which define other Work indicated in the Contract Documents

Bid Results

Arenas / Stadiums

$401,041.00

Public - City

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
140
Bidding Soon
2,498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

May 13, 2022

Project location map

373 Carroll St, Akron, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.