Renovation of a mixed-use development in Manchester, New Hampshire. Completed plans call for the renovation of a educational facility.
This Design and Build Project involves high voltage utility electricity, transformer installation, high voltage primary wiring, and secondary wiring at Beech Street and Hillside and switchgear replacement at Hillside Middle School with provisions of project management, equipment, materials, installation, quality control and delivery as specified in this RFP. The City will enter into a written contract utilizing a completed contract for small projects (exhibit F) and a purchase order to the selected contractor who will be responsible for the supply and completing all aspects of the project as defined in this RFP. The contractor will conduct a thorough review of all of the requested work and must take responsibility for the entire contract, scope of work as detailed in the drawings and provide the City with a one year warranty starting once all work is 100% completed and approved by the owner. The start date is to be coordinated with the owner but assumed to be around late Mid June 2022 and with all materials on site. The Owner will partially occupy the existing facility during this timeframe and the contractor will need to anticipate the operating schedule. A 10% Bid Bond for the highest total bid amount from an authorized bonding agent is required to be submitted with the bid. For a complete list of expectations and Contract documents please visit the purchasing website at www.manchesternh.gov/bids and follow the instructions for this project. See page 6 for further information. Questions or comments regarding this proposal shall be directed in writing only via email to Eric Krueger ekrueger@manchesternh.gov and received no later than 8:00 am on Wednesday March 2, 2022. All questions and responses pertaining to this proposal and/or any amendments will be posted to the City's purchasing website by 11:00 AM on Friday March 4, 2022. It is the proposer's responsibility to check the website prior to the submittal deadline to ensure they have the most up to date information pertaining to the RFP. In addition any addendums must be acknowledged in the submitted proposal. Selection of the successful bidder will be in accordance with Chapter 39: Procurement Code of the City of Manchester, Code of Ordinances. The Chief of Facilities reserves the right to waive any irregularities, reject any or all bids, and to accept the bid that appears to be in the best interest of the City. Failure to submit all information called for may be sufficient for disqualification. The Department of Public Works reserves the right to extend the contract for a period of up to three years, to the successful bidder or bidders after the issuance of a contract or purchase order. Estimated construction cost will likely be greater than $100K for Hillside and less than $100K for Beech. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Results :: Base Bid #1 :: Demand Electric ::$38,400 Base Bid #2 :: Demand Electric :: $110,000
Award
Educational
$148,400.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2022
June 1, 2022
Multiple Locations, Manchester, NH
Related To This Project
Manchester, NH
Bid Date: Apr 15 2022
Manchester, NH
Bid Date: Mar 22 2022
Manchester, NH
Bid Date: Apr 28 2022
Manchester, NH
Bid Date: Apr 28 2022
Manchester, NH
Bid Date: Apr 12 2022
Manchester, NH
Bid Date: May 04 2022
Manchester, NH
Bid Date: Mar 31 2022
Manchester, NH
Bid Date: May 06 2022
Manchester, NH
Bid Date: Jan 17 2023
Manchester, NH
Bid Date: Feb 03 2023
Manchester, NH
Bid Date: Feb 03 2023
Manchester, NH
Bid Date: Feb 03 2023
Manchester, NH
Bid Date: Jan 17 2023
Manchester, NH
Bid Date: Dec 23 2022
Manchester, NH
Bid Date: Dec 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.