Renovation of a mixed-use development in Manchester, New Hampshire. Completed plans call for the renovation of a educational facility.

This Design and Build Project involves high voltage utility electricity, transformer installation, high voltage primary wiring, and secondary wiring at Beech Street and Hillside and switchgear replacement at Hillside Middle School with provisions of project management, equipment, materials, installation, quality control and delivery as specified in this RFP. The City will enter into a written contract utilizing a completed contract for small projects (exhibit F) and a purchase order to the selected contractor who will be responsible for the supply and completing all aspects of the project as defined in this RFP. The contractor will conduct a thorough review of all of the requested work and must take responsibility for the entire contract, scope of work as detailed in the drawings and provide the City with a one year warranty starting once all work is 100% completed and approved by the owner. The start date is to be coordinated with the owner but assumed to be around late Mid June 2022 and with all materials on site. The Owner will partially occupy the existing facility during this timeframe and the contractor will need to anticipate the operating schedule. A 10% Bid Bond for the highest total bid amount from an authorized bonding agent is required to be submitted with the bid. For a complete list of expectations and Contract documents please visit the purchasing website at www.manchesternh.gov/bids and follow the instructions for this project. See page 6 for further information. Questions or comments regarding this proposal shall be directed in writing only via email to Eric Krueger ekrueger@manchesternh.gov and received no later than 8:00 am on Wednesday March 2, 2022. All questions and responses pertaining to this proposal and/or any amendments will be posted to the City's purchasing website by 11:00 AM on Friday March 4, 2022. It is the proposer's responsibility to check the website prior to the submittal deadline to ensure they have the most up to date information pertaining to the RFP. In addition any addendums must be acknowledged in the submitted proposal. Selection of the successful bidder will be in accordance with Chapter 39: Procurement Code of the City of Manchester, Code of Ordinances. The Chief of Facilities reserves the right to waive any irregularities, reject any or all bids, and to accept the bid that appears to be in the best interest of the City. Failure to submit all information called for may be sufficient for disqualification. The Department of Public Works reserves the right to extend the contract for a period of up to three years, to the successful bidder or bidders after the issuance of a contract or purchase order. Estimated construction cost will likely be greater than $100K for Hillside and less than $100K for Beech. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Results :: Base Bid #1 :: Demand Electric ::$38,400 Base Bid #2 :: Demand Electric :: $110,000

Award

Educational

$148,400.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
301
Active Projects
192
Bidding Soon
2,400
All Active Projects
1,066
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2022

June 1, 2022

img_map_placeholder

Multiple Locations, Manchester, NH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.