Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Wilton, Iowa. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Project Id : 220315 S2 Counties : Muscatine Working Days : 75 Brfn-006-8(38)--39-70 Route: U.s. 6 Sugar Creek 2.3 Mi W of Ia 38 Stpn-006-8(41)--2j-70 Route: U.s. 6 1.2 Mi E of Co Rd X46 to 1.1 Mi W of Ia 38 (2 Locations) Stpn-006-8(45)--2j-70 Route: U.s. 6 Ecl of West Liberty to Ia 38 Estimated Value : $1,250,000 - $1,500,000 Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to Execute a Contract and File an Acceptable Performance Bond and Certificate of Insurance Within 30 Days of the Approval Date for Awarding the Contract Will Be Just and Sufficient Cause for the Denial of the Award and Forfeiture of the Proposal Guaranty. On Federal-aid Projects, Where Disadvantaged Business Enterprise (Dbe) Goals Have Been Established, the Bidder Is Required to Complete and Submit Form 102115 With the Bid Documents. On All Projects Without Dbe Goals, the Contractor Must Show That Affirmative Action Has Been Made to Seek Out and Consider Dbes as Potential Subcontractors. Minimum Wage Rates for All Federal-aid Projects Have Been Predetermined by the U.s. Secretary of Labor and Are Set Forth in the Specifications. However, This Does Not Apply to Projects Off the Federal-aid Highway System. All Federal-aid Projects Are Subject to the Contract Work Hours Standards Act, as Amended (Title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and Implementing Regulations. The Iowa Dot Reserves the Right to Waive Technicalities and Reject Any or All Bids. Iowa Dot - Bid Order Number: 008 - Bridge Deck Overlay - US 6 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$1,347,369.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 15, 2022
July 11, 2022
US-6, Wilton, IA
Related To This Project
Wilton, IA
Bid Date: Jun 21 2023
Wilton, IA
Bid Date: Jun 11 2020
Wilton, IA
Bid Date: Aug 01 2019
Wilton, IA
Bid Date: Mar 21 2024
Wilton, IA
Bid Date: Feb 21 2024
Wilton, IA
Bid Date: May 21 2024
Wilton, IA
Bid Date: May 23 2024
Wilton, IA
Bid Date: Nov 02 2020
Wilton, IA
Bid Date: Dec 07 2022
Des Moines, IA
Bid Date: Feb 07 2023
Des Moines, IA
Bid Date: Feb 07 2023
Story City, IA
Bid Date: Feb 15 2023
Alburnett, IA
Bid Date: Feb 06 2023
Mason City, IA
Bid Date: Feb 01 2023
Grinnell, IA
Bid Date: Feb 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.