Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 7, 2022 at 7:00 PM
Updated November 15, 2023
Renovation of a mixed-use development in Brazil, Indiana. Completed plans call for the renovation of a educational facility.
HVAC renovations at multiple facilities for Clay Community School Corporation Relocation and restoration to original location of furnishings required for accessing work. 2. Removal and replacement of ceiling tile required for access to work. Care shall be taken when removing and replacing ceiling tile. An allowance for replacement of damaged ceiling tile is provided in 01 21 00. 3. An allowance for miscellaneous patching of finishes shall be included. Refer to 01 21 00 Allowances. 4. Final cleaning of all work areas shall be performed immediately after work is completed. 5. Structural and miscellaneous steel for equipment, piping, etc. related to this scope. 6. Reinforcing of roof structure per Contract Documents. . Any roof patching for equipment, piping, etc. related to this scope of work. Existing roofs are currently under Durolast warranty and shall be coordinated with Pell's Roofing. 8. Removal and patching to match existing portions of drywall and plaster as required for access to work. 9. Concrete pad modifications to new equipment and new pads per manufacturer's requirements. *Addendum 1 and 2 have been uploaded.
Post-Bid
Educational
$200,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2022
April 7, 2022
1013 S Forest Ave, Brazil, IN
Related To This Project
Brazil, IN
Bid Date: Mar 07 2022
Brazil, IN
Bid Date: Mar 31 2022
Brazil, IN
Bid Date: Mar 14 2019
Brazil, IN
Bid Date: Jun 09 2021
Brazil, IN
--
Brazil, IN
Bid Date: Jul 01 2024
Brazil, IN
Bid Date: Jul 01 2024
Brazil, IN
Bid Date: Aug 02 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
