BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of an educational facility in Charleston, South Carolina. Completed plans call for the construction of a 75,000-square-foot educational facility; and for site work for a educational facility.

Construct a six story, approximate 75,000 square foot building on President Street directly north of the existing MUSC Bioengineering Building (BEB) including an elevated pedestrian connection to BEB Construction Cost Range: $30M to $36M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Owner wishes to begin construction work by December 2023 and complete all construction by the summer of 2025.

Post-Bid

Educational

$36,000,000.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
62
Bidding Soon
767
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2022

December 1, 2023

Project location map

171 Ashley Ave, Charleston, SC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.