BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2022 at 7:00 PM

Updated February 9, 2024

Site work for a water / sewer project in Edgewood, Kentucky. Completed plans call for site work for a water / sewer project.

Construction of approximately 900 linear feet of 16" ductile iron water main along Dudley Road from Summit Hills CC Drive to Pennsylvania Avenue in the City of Edgewood, Kenton County, Kentucky. This project will also include the abandonment of approximately 3,100 linear feet of an existing 8" water main and switching services and side street connections to an existing 16" water main along Dudley Road {Catherine Drive to Summit Hills CC Drive}. The abandonment work will involve the installation of approximately 170 linear feet of 8" ductile iron water main to connect the side street water mains to the existing 16" water main along Dudley Road and the replacement of approximately 13 services together with the appurtenances and related work.

Bid Results

Water / Sewer

$383,243.00

Public - City

Site Work

12

8

2

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
180
Bidding Soon
2,429
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2022

April 4, 2022

Project location map

Dudley Rd, Edgewood, KY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.