Site work for a playground / park / athletic field in Ephrata, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.

As of November 10, 2022, all bids have been rejected. At this time, the project is not expected to be rebid. The Contract will include, but not necessarily be limited to, approximately 730 feet long by 25' wide area of tree clearing, stump removal, grading for a trail, and slope grading. Clarification Deadline: 3/25/2022 2:00 PM A certified check or bid bond for the amount of ten percent of the total bid shall be required. Bonds are to be issued by a surety licensed to do business in the Commonwealth of Pennsylvania. The successful Bidder shall be required to furnish performance and payment bonds in the amount of 100% of the Contract Price. Only those questions submitted shall be considered. Questions received after 2:00 PM on March 25, 2022, regarding the project will not be acknowledged. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by OWNER and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety's written consent. If designated as the successful bidder, the contractor will begin work on the date specified in the notice to proceed, or as otherwise provided in the special requirements, and will complete all work on or before September 30, 2022. If all work is not completed on time, liquidated damages will be assessed at the rate as specified in the Special Provisions to Contract MS-944. Ephrata Township reserves the right to accept or reject any or all Bids. No pre Bid meeting. Project Identification: Project consists of approximately 730 feet long by 25 feet wide area of tree clearing and stabilization. 1. Project location: Ephrata Township Community Park located on Fulton Street south of Lake View Road.

Bid Results

Playgrounds / Parks / Athletic Fields

$90,450.00

Public - City

Site Work

6

16

3

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
96
Bidding Soon
2,049
All Active Projects
936
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2022

April 20, 2022

img_map_placeholder

436 E Fulton St, Ephrata, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.