BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Sully, Iowa. Completed plans call for the renovation of a educational facility.

A secure entrance renovation at the High School. The existing main entrance vestibule and High School office will be reconfigured to allow visitors to enter though the office prior to gaining access to other areas of the school. Approximately 1,400 S.F. of space will be renovated which will include interior finishes, millwork, storefront windows, doors and hardware, and associated mechanical, electrical, plumbing and technology changes. Bids will be received and project constructed under a single prime contract. Bids must be on a lump sum basis. Material Procurement and Shop Drawings to commence on or about March 28, 2022, and On-Site Construction to commence on or about Mau 31, 2022, and be substantially complete on or before August 8, 2022. Final Acceptance of the Project shall be on or before August 22, 2022. Each Bid shall be accompanied by a Bid Security in the amount of five percent (5%) of the total bid submitted. Bid Security must be in the form set forth in the Instructions to Bidders and submitted in a separate sealed envelope clearly labeled Bid Security. Bid Security must be in one of the following forms: Certified Check, Cashier's Check, Certified Share Draft or an approved Bond Form. The successful Bidder will be required to furnish a Certificate of Insurance and Performance and Labor and Material Payment Bonds both in an amount equal to 100% of the Contract Price and in accordance with other requirements outlined in the Bid Documents. Should the successful bidder fail or neglect to furnish satisfactory performance/payment bonds, refuse to enter into a Contract on the basis of the bid, or fail to meet the requirements of this Notice and the specifications regulating the award, the bidder's security may be retained as liquidated damages. No bidder may withdraw its bid for a period of forty-five (45) calendar days after the date and hour set for opening of bids. The Board of Directors of the Lynnville-Sully CSD (District) reserves the right to conduct such investigations as allowed by law to assist in the evaluation of and to establish the responsibility and qualifications of the apparent low bidders to perform the work in accordance with the contract documents to its satisfaction within the prescribed time. In addition, the District may require submission by the apparent low bidder of AIA Document A305, Contractor Qualification Statement, at its discretion Project no. 121-010

Bid Results

Educational

$245,000.00

Public - City

Renovation

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
58
Bidding Soon
1,138
All Active Projects
388
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 15, 2022

May 31, 2022

August 22, 2022

img_map_placeholder

12476 Hwy F62 E, Sully, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.