Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a pre-engineered storage facility in Weston, Wisconsin. Working plans call for the construction of a 2,800-square-foot pre-engineered storage facility.
As of September 27, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Drawings and Specifications dated August 04, 2022 as prepared by: Kueny Architects, LLC 10505 Corporate Drive, Suite 100, Pleasant Prairie, Wisconsin 53158. Phone number (414) 690-3197 jonw@kuenyarch.com The project consists of three salt structure options for bidding. Bid Option #01 to include the construction of a new salt structure. The structure is to contain concrete retaining walls with a wood truss roof framing system. Bid Option #2 to include the construction of a new salt structure. The structure is to contain timber columns and wood framed construction. Bid Option #03 to include the disassembling of the existing salt structure (located at the existing Village Hall) and reassembling at the new site. In addition, the bid is to include construction of the lean-to style bin storage building. Bids will be based on a single lump sum for the following separate Contracts: 1. General Bidders may be required to submit a brief statement of their qualifications to the Architect before submitting a Bid. All Bidders will be required to submit a complete list of subcontractors with their proposals. within 24 hours after bid due date. All Bids will remain firm for a period of 90 days after the opening date. A certified check or a satisfactory Bid Bond executed by the Bidder and satisfactory Surety Company in the amount of 10% of the Bid made payable to The Village of Weston, shall accompany each bid. Successful Bidders will be required to furnish and pay for a satisfactory Performance Bond, and Labor and Materials Bond in the amount of 100% of the Contract. The Owner reserves the right to accept or reject any and all Bids in their best interest. Bid Results Bid Option 1 - S D Ellenbecker Contractors - $1081800 Bid Option 2 - S D Ellenbecker Contractors - $1003000
Final Planning
Warehouse / Distribution - Pre-Engineered Storage Building
$2,084,800.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2022
November 3, 2022
4707 Camp Phillips Rd, Weston, WI
Related To This Project
Weston, WI
Bid Date: Mar 09 2022
Weston, WI
Bid Date: Mar 09 2022
Weston, WI
Bid Date: Apr 13 2022
Weston, WI
Bid Date: Apr 13 2022
Weston, WI
Bid Date: Mar 09 2022
Weston, WI
--
Weston, WI
Bid Date: Jun 09 2022
Weston, WI
Bid Date: Jun 14 2022
West Salem, WI
Bid Date: May 10 2022
Waupaca, WI
Bid Date: Oct 31 2022
Madison, WI
--
Waunakee, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.