BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Weston, Wisconsin. Working plans call for the construction of a 2,800-square-foot pre-engineered storage facility.

As of September 27, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Drawings and Specifications dated August 04, 2022 as prepared by: Kueny Architects, LLC 10505 Corporate Drive, Suite 100, Pleasant Prairie, Wisconsin 53158. Phone number (414) 690-3197 jonw@kuenyarch.com The project consists of three salt structure options for bidding. Bid Option #01 to include the construction of a new salt structure. The structure is to contain concrete retaining walls with a wood truss roof framing system. Bid Option #2 to include the construction of a new salt structure. The structure is to contain timber columns and wood framed construction. Bid Option #03 to include the disassembling of the existing salt structure (located at the existing Village Hall) and reassembling at the new site. In addition, the bid is to include construction of the lean-to style bin storage building. Bids will be based on a single lump sum for the following separate Contracts: 1. General Bidders may be required to submit a brief statement of their qualifications to the Architect before submitting a Bid. All Bidders will be required to submit a complete list of subcontractors with their proposals. within 24 hours after bid due date. All Bids will remain firm for a period of 90 days after the opening date. A certified check or a satisfactory Bid Bond executed by the Bidder and satisfactory Surety Company in the amount of 10% of the Bid made payable to The Village of Weston, shall accompany each bid. Successful Bidders will be required to furnish and pay for a satisfactory Performance Bond, and Labor and Materials Bond in the amount of 100% of the Contract. The Owner reserves the right to accept or reject any and all Bids in their best interest. Bid Results Bid Option 1 - S D Ellenbecker Contractors - $1081800 Bid Option 2 - S D Ellenbecker Contractors - $1003000

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$2,084,800.00

Public - City

New Construction, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
19
Bidding Soon
218
All Active Projects
86
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

November 3, 2022

img_map_placeholder

4707 Camp Phillips Rd, Weston, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.