BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2022 at 8:00 PM

Updated November 15, 2023

Site work and new construction of a municipal facility in Williamsburg, Massachusetts. Completed plans call for the construction of a 8,000-square-foot municipal facility; and for site work for a municipal facility.

Contractor Qualification DCAMM Certificate Construction of a new 8,000 SF Public Safety Complex. The scope of work includes the construction of a single story, wood framed, slab on grade, 8,000 square foot public safety building. The demolition of the existing Helen E. James School building on site will be done by others. Tree removal on the site will be by others. Backfill required from the excavation and demolition of the school building will be required under this contract/scope substantially completed on or before October 1, 2023 and completed on or before November 1, 2023.

Bid Results

Municipal

$3,764,618.00

Public - City

New Construction, Site Work

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
535
Active Projects
167
Bidding Soon
3,755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

May 30, 2022

Project location map

To Be Determined, Williamsburg, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.