BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Manitowoc, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.

This Contract consists of: 1. Asphalt resurfacing on Washington Street from South 21st to South 25th Street: Work includes existing asphalt milling and removal, unclassified excavation, 8" H.E.S. concrete, 6" C.A.B.C. with 2" HMA patches, New 3" HMA pavement, manhole & inlet resurfacing/relining with a cementitious liner, casting replacement and epoxy pavement markings. 2. Reconstruction of Alley #4 Bounded by Lincoln Blvd., North 8th St, New York Ave. & Cleveland Ave.: Work includes unclassified excavation, geotextile fabric, new 12" C.A.B.C., 3" HMA pavement, topsoil, seed, and E-mat. 3. Reconstruction of Alley #6 Bounded by Lincoln Blvd., North 6th St., New York Ave. & Pine Street: Work includes unclassified excavation, geotextile fabric, new 12" C.A.B.C., 3" HMA pavement, 8" PVC Storm Sewer, Type 1 Field Inlet, topsoil, seed, and E-mat. 4. Reconstruction of Alley #21 Bounded by Waldo Blvd., Rankin St., North 20th St., & N. 21st St.: Work includes unclassified excavation, geotextile fabric, new 12" of C.A.B.C., 3" HMA pavement, topsoil, seed, and E-mat. 5. Reconstruction & Resurfacing of Mariners Trail from E. to 550 Feet North of Lilac Drive: The trail shall be completely reconstructed and slightly relocated from E. Avenue to just south of E. Magnolia Ave. and the work includes unclassified excavation, geotextile fabric, 8" C.A.B.C., 2.5" HMA Pavement, topsoil, seed, and E-mat. The trail shall be resurfaced from just south of E. Magnolia Ave. to 550 feet north of Lilac Drive and the work includes milling butt joints in the existing asphalt at driveway locations and on each end of the project and resurfacing or overlaying the trail with 1-1/2 inches of HMA Pavement, topsoil, seed, and E-mat. Mariners Trail 21 Calendar Days June 10, 2022 Washington Street 21 Calendar Days August 1, 2022 Alley #4 30 Calendar Days August 12, 2022 Alley #6 30 Calendar Days August 26, 2022 Alley #21 30 Calendar Days August 26, 2022

Bid Results

Roads / Highways

$598,314.00

Public - City

Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
41
Bidding Soon
492
All Active Projects
201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

April 8, 2022

img_map_placeholder

Multiple Locations, Manitowoc, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.