BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Rossville, Indiana. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Note: This project name shall be understood to include the entire scope of project as defined and detailed by these specifications and Contract Documents. Flash Drive containing Bidding Requirements in portable document format (PDF) $85.00, Electronic download of Bidding Requirements by email (PDF) $75.00, For further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders, and if applicable Supplemental Instructions to Bidders, that are included in the Bidding Requirements. Note l: The Engineer assumes no responsibility to supply Builders Exchanges and similar plan review rooms with all addenda issued. An attempt will be made to do so; however, only registered plan holders will be notified by email of expected or late term addendum with short preparation times. Note 2: Prequalification of BIDDERS - Dixon Engineering will review qualifications of all Contractors and determine their status. Contractors will be prequalified for different sized tanks and towers based on experience, workmanship, successful Project completions with DIXON and Contractor's financial data. Prequalification protocol is in the Instructions to Bidders. Any Contractor who has any projects in dispute or unfinished because of Contract problems will be considered NOT prequalified. Disqualification will result in the return of any handling fee for Bidding Documents. The tank may be out-of-service a maximum of 30 days. Liquidated damages are applicable and begin after 30 days out-of-service or after Substantial Completion date whichever is the earlier date. Liquidated damages at $1,250/calendar day shall apply after this date. Ready for Final Payment Date shall be thirty (30) days after date Substantial Completion Date based on out-of-service days or scheduled Substantial Completion, or as adjusted by Change Order; or actual Substantial Completion if earlier. Liquidated damages after Ready for Final Payment Date of $250/day shall apply. Liquidated damages are cumulative if damages from Substantial Completion and Ready for Final Payment overlap. In addition, Special Damages, fines, or Set-offs may also apply per Bid/Agreement Form. SCOPE of WORK: Tank Information: The structure is a 150,000 gallon double ellipse elevated water storage tank with a high-water level of 131 feet located at 2002 West Ramey St. in Rossville, Indiana. The work includes: Exterior: High pressure water clean (5,000 to 10,000 psi), spot power tool clean to a SSPC-SP11 standard and apply a three (3) coat epoxy urethane system. Wet Interior: Abrasive blast clean to a SSPC-SP10 near-white metal standard and apply a three (3) coat zinc epoxy system. Foundation: Water clean and apply a two (2) coat epoxy system. Mixer: Install a mechanical mixer. Repairs: 1) Install riser manway. 2) Replace the wet interior roof hatch. 3) Install a riser grate. 4) Install deflector bars on the fill/draw pipe. 5) Overflow discharge modification. 6) Install a fall prevention device on the wet interior ladder. 7) Repair the wet interior ladder. 8) Install a roof platform. 9) Replace vent with a frost-free roof vent. 10) Install cathodic clips and pressure fitting. 11) Install a roof handrail with a painter's railing. 12) Install bowl rigging couplings. 13) Replace the aviation light. 14) Balcony drain holes. 15) Balcony access modification.

Award

Water / Sewer

$212,440.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
53
Bidding Soon
930
All Active Projects
418
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 8, 2022

June 1, 2022

August 31, 2022

img_map_placeholder

2002 West Ramey St., Rossville, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.