BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2022 at 7:00 PM

Updated November 15, 2023

Site work and renovation of a mixed-use development in Midland, Michigan. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

DIVISION 04 - MASONRY - The intent of this bid request is to obtain an offer to perform work to complete 2022 District Wide Masonry Repairs located throughout Midland Public Schools district for a stipulated sum contract. Caulk all products installed (interior and exterior) by this Contractor, except hollow metal frame. This caulking between the lintel and the block if required. Furnish, install and maintain all shoring and bracing as required. Leave shoring in place until new building systems are in place and then remove as required. Prior to installation of shoring and bracing efforts, provide shop drawings on the proposed shoring and bracing design. A registered engineer in the State of Michigan must seal drawings. Furnish and install all interior and exterior concrete masonry units, above and below grade, bond beams, face brick, pre-cast lintels, glazed concrete masonry units, glass unit masonry, joint materials, dampproofing, waterproofing, insulation, compressible fillers, backer rod, anchors, ties, bearing plates, reinforcing, through-wall flashing and drip edges, building paper, weep holes, premolded expansion strip, exterior and interior caulking and sealant, anchor bolts and other accessories shown or required for a complete product. Bidders will be required to submit with their Bid Proposals a Bid Security, in the amount of 5% of base bid, by a qualified surety authorized to do business in the state where the Project is located. RFIs Due Mar 1, 2022 at 4:00 PM EST The tentative schedule for this work is start: June 1, 2022, complete: August 5, 2022. **A reminder that a Walk-through is mandatory for your bid to be considered on bid day. The mandatory walk-through is only required for District Wide Fencing and District Wide Masonry Repair. You can walk the job sites without Barton Malow personnel but must contact Lisa Polega (Lisa.Polega@Bartonmalow.com) before doing so. The prebid presentation can be found in Addendum No. 1 in the Files tab.**

Post-Bid

Educational

$1,000,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
91
Bidding Soon
1,329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

June 1, 2022

Project location map

Multiple Locations, Midland, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.