BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 3, 2024 at 7:00 PM

Updated April 30, 2024

Site work and paving for a transportation facility in Spokane Vly, Washington. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

As of January 3, 2024, a general contractor was awarded and construction was completed in fall 2023. *The closed solicitation has been included below for reference: The Spokane Airport Board is requesting Statements of Qualifications (SOQ) from qualified consulting firms for engineering and construction management/administration services for the Aircraft Tie-Down Apron Improvements at Felts Field. The method of Contractor Selection has not been Determined As of March 2, 2022, the due date and time has been confirmed with the owner.

Occupancy

Transportation Terminals

$300,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
29
Bidding Soon
320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2023

Project location map

6105 E Rutter Ave, Spokane Vly, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.