BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2022 at 7:00 PM

Updated November 14, 2023

Site work and new construction of a mixed-use development in Schererville, Indiana. Completed plans call for site work for a playground / park / athletic field.

Contractors can direct generaland Town supplied equipment relatedquestions to John Novacich, Superintendent of Parks and Recreation at jnovacich@schererville.org.Site engineering questions shall be submitted to Neil Simstad, Town Engineer at nsimstad@niesengineering.com.All questions shall be submitted nolater than Friday,February 25,2022. The Town of Schererville Board of Parks and Recreation is seeking proposals from qualified contractors for the Community Center Splash Pad Project at Scherwood Park, Work will entail construction of a concrete splash pad with installation of water play spray features, water and drain lines, mechanical enclosure with pad and vault, control panel, distribution manifold with sequencing valves, electrical wiring. Total area size, with 5' apron is 60' x 70'. It shall be the responsibility of the contractor to review all enclosed material and drawings and have a clear and thorough understanding of these specifications, scope of work, and provisions required prior to submitting a proposal. All work shall be performed as indicated on the drawings and specifications and include every aspect of work as obvious or implied and necessary to make the project complete and fully operational. It is advisable that interested contractors visit the install location to inspect the existing conditions and to understand the extent of work needed to complete the project. If the contractor finds any conditions on site that would affect the proposal, they should notify the contact person. NOTE: Add'l specifications for mechanical enclosure concrete pad and drain pit shown on drawing shall be 8" granular compacted base w/ 4000 psi concrete, 4" thick concrete w/ #4 rebar 12"o.c. both ways. Scherwood Park, 500 E. Joliet Street, Schererville, IN 46375. Refer to site map for general location within park

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
733
Active Projects
496
Bidding Soon
3,536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2022

April 1, 2022

Project location map

500 E Joliet St, Schererville, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.