BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Cicero, Illinois. Completed plans call for the renovation of a two-story above grade library.

The project consists of but is not limited to the following work: 1. Tear-off & replacement of existing roofing, flashing, insulation, copings & fascia. 2. Replacement of existing gutters & downspouts. 3. Replacement of existing RTU's. 4. Sealant removal & replacement All proposals or bids must be accompanied by a Bid Bond, Cash, or Certified Check made payable to the Cicero Public Library in the amount of not less than five percent (5%) of the total amount of the Proposal as a guarantee that if the Proposal is accepted, a Contract will be entered into and the performance of the Contract is properly secured. No bid shall be withdrawn after the opening of the proposals without the consent of the Cicero Public Library Board of Trustees for a period of forty-five (45) days after the scheduled time of closing bids. The successful Bidder for the construction of the improvement will be required to file a Performance Bond equal to one hundred percent (100%) of the bid, with sureties to be approved by the Cicero Public Library Board of Trustees, which Performance Bond shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the Plans and Specifications therefore, according to the time and terms and conditions of the Contract; and also that the Bidder and Contractor shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and materials furnished. The Contractor shall be required to furnish sufficient insurance or guaranty of indemnity the Cicero Public Library, Town of Cicero, Illinois, against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractor(s), or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the Cicero Public Library Board of Trustees, the right to reject any and all Proposals or Bids is reserved. Dated at Cicero, Illinois, this 24th day of February 2022. CICERO PUBLIC LIBRARY BOARD OF TRUSTEES By: Ismael Vargas (s) President ATTEST: Maureen Carol Secretary

Post-Bid

Library

$200,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
95
Bidding Soon
1,770
All Active Projects
818
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

April 18, 2022

img_map_placeholder

5225 W Cermak Rd, Cicero, IL


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.