Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 21, 2022 at 8:00 PM
Updated September 14, 2023
Site work and paving for a mixed-use development in Davie, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Counties: Broward Road Name: Sw 64th Ave Limits: From Sw 35th St to Pembroke Rd Project(s): 44157815201(*) Federal Aid No: D421078B Project(s): 44157815202 Federal Aid No: N/A Project(s): 44157815203 Federal Aid No: N/A Total Roadway Length: 1.142 Miles Contract Days: 229 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.142 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 40 Calendar Days The improvements under this contract consist of, but not limited to, maintenance of traffic, earthwork (embankment), monitor existing structures (inspection, settlement, vibration), asphalt (milling, superpave, friction course), concrete (curb, gutter, sidewalk, driveways), signing (single-post, panel), pavement markings (patterned, detectable, raised, painted, thermoplastic), pavers, drainage (inlets, adjustments, French drain, pipe culvert), utilities (valve box adjustments, manhole adjustments, fire hydrant adjustments, fire hydrant modification, sewer), pull/splice box, tree (protection, roots and branch pruning, removal), and sod along SW 64th Ave. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 016 Drainage Improvements/Milling and Resurfacing/Sidewalk/Base Work
Award
Roads / Highways
$2,249,738.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2022
May 30, 2022
SW 64th Ave, Davie, FL
Related To This Project
Davie, FL
Bid Date: Mar 24 2022
Davie, FL
Bid Date: May 20 2022
Davie, FL
--
Davie, FL
--
Davie, FL
Bid Date: May 10 2022
Davie, FL
--
Davie, FL
--
Davie, FL
Bid Date: Apr 21 2022
Davie, FL
--
Davie, FL
Bid Date: Nov 30 2021
Davie, FL
Bid Date: Feb 22 2023
Davie, FL
Bid Date: Dec 29 2022
Davie, FL
Bid Date: Jan 04 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
