EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Painesville, Ohio. Completed plans call for the renovation of a educational facility.

Bids will be received for the following: Single Prime Mechanical Construction Work, which also includes the following Sub-Contractor Work: Electrical / Technology Work. Any questions pertaining to interpretation of Contract Documents are to be submitted in writing to the Architect: SOL Harris/Day Architecture Attn: Domenic Ferrante, AIA 6677 Frank Ave. NW North Canton, OH 44720 Phone: 330-493-3722 The only bids that will be accepted will be those bidders of record. Bidders of record are those who have signed the bidders list which is held by Northeast Blueprint, obtained the Contract Documents, paid the prescribed fee. Each bid shall be in conformity with the Ohio Revised Code and all bids and certificates shall be upon the forms furnished with the specifications and shall be delivered to the Riverside Local School District Board of Education 585 Riverside Drive, Painesville, Ohio 44077 at or prior to the date and hour specified for receiving bids. The Owner is not responsible if documents are received too late for timely bid. In the case of corporations not chartered in Ohio, the bid shall be accompanied by a proper certificate of the Secretary of State, certifying that such corporation is authorized to do business in Ohio. Each bid shall be accompanied by a bid guaranty in the form of: (1) a certified check, or cashier s check, or letter of credit, equal to 10% of the bid; or (2) a bid and performance guaranty bond for the full amount of the bid; both forms of guaranty as provided in Chapter 153 of the Ohio Revised Code. The amount of the bid for said guaranty purposes shall include all additive alternates if appropriate. All bid guaranties shall be on condition that if the bid is accepted within sixty (60) days of the bid opening, a proper Contract shall be executed, and that upon failure or refusal to enter into said contract within ten (10) days after receipt of notification of award the bidder and the surety on any bond shall be liable to the Riverside Local School District Board of Education in an amount not to exceed ten (10%) percent of the bid. No Bidder may withdraw his Proposal for a period of sixty (60) calendar days after the date and time of receipt of bids, except as provided by State law. The Riverside Local School District Board of Education reserves the right to reject any or all bids, to waive any informalities or irregularities in the bids received, and to accept any bid or combination of bids which is deemed most favorable to the Riverside Local School District Board of Education at the time and under the conditions stipulated. The Riverside Local School District Board of Education further declare that they will award the contracts for this project to the lowest responsive bidder, which may not necessarily be the lowest bidder. The Specifications contain AIA Document A305, Contractor s Qualification Statement designed to gather certain information that No single factor will control the Owner s decision to award, and the Owner reserves the right to exercise its full discretion.

Bid Results

Educational

$374,280.00

Public - City

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Curtain Wall and Glazed Assemblies, Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Ceilings, Painting and Coating
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Communications Utilities, Communications Distribution
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
106
Bidding Soon
1,016
All Active Projects
474
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2022

April 13, 2022

img_map_placeholder

6700 Auburn Rd, Painesville, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Riverside Local School District: LaMuth Middle School Boiler Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.