BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work and paving for a road / highway in Aurora, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Update: Resurfacing of Indian Trail utilizing Surface Transportation Program (STP) federal funds administered through the KaneKendall Council of Mayors. The project will be processed as a Local Agency Functional Overlay project. The federal participation will be 75% of construction costs, up to a maximum of $750,000. The Illinois Department of Transportation will front-fund the cost of construction and invoice the city for its 25% share and beyond the federal maximum participation amount. Phase I and II will be completed in-house by engineering staff with drafting assistance by a consultant. Construction is expected to begin in 2025. Project is included in City of Aurora Fiscal Year 2025-2034 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: https://www.aurora-il.org/DocumentCenter/View/13219/Capital-Improvements-Plan-2024-2033 Resurfacing of Indian Trail utilizing Surface Transportation Program (STP) federal funds administered through the KaneKendall Council of Mayors. The project will be processed as a Local Agency Functional Overlay project. The federal participation will be 75% of construction costs, up to a maximum of $750,000. The Illinois Department of Transportation will front-fund the cost of construction and invoice the city for its 25% share and beyond the federal maximum participation amount. Phase I and II will be completed in-house by engineering staff with drafting assistance by a consultant. Construction is expected to begin in 2025. Project is included City of Aurora Fiscal Year 2024-2033 Page no 260 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A detailed scope of work has not been determined. As of May 17, 2023, this project is included in the City of Aurora's FY 2023-2032 CIP and funding is allotted for FY 2024 and FY 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$317,300.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
243
Bidding Soon
3,341
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

Indian Trail, Aurora, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.